W50S8D26QA015
Response Deadline
Aug 6, 2026, 2:00 PM(EDT)20 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
There is NO incumbent contractor or existing contract in place for this requirement. This is a first time requirement.
Relocation of a Generac Model SBE500 Battery Energy Storage System (BESS) from a contractor storage lot in the vicinity of Dover Air Force Base (AFB), Delaware, to a designated site at Hanger 101, Stewart Air National Guard Base (ANGB), New York. Contractor will be responsible for, but not limited to: visually inspecting BESS and documenting, load and transfer BESS to 12550, off load BESS on dunnage provided by the contractor for BESS to ensure no damage to the ground surface. All other requirements for this project are listed in the attached Performance Work Statement (PWS). I've also attached a picture of the BESS and the spec sheets. NOTE: the contractor is responsible for loading and offloading the BESS. The government will NOT supply a crane, forklift, or any other means to perform this task. Loading and offloading the BESS is the responsibility of the contractor.
DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO NY
USPFO NY PROCUREMENT
W7NR USPFO ACTIVITY NYANG 105
W7NR USPFO ACTIVITY NYANG 105
KO FOR NYANG DO NOT DELETE
ONE MILITIA WAY BLDG 204
NEWBURGH, NY, 12550-5042
NAICS
Freight Transportation Arrangement
PSC
TRANSPORTATION/TRAVEL/RELOCATION- TRANSPORTATION: OTHER
Set-Aside
Total Small Business Set-Aside (FAR 19.5)