Loading...
W50S6T26QA034
Response Deadline
Sep 24, 2026, 10:00 PM(PDT)14 days
Eligibility
Contract Type
Solicitation
The California Air National Guard (CA ANG) intends to issue a Request for Quote (RFQ) to award a single firm fixed price (FFP) contract for an HVAC replacement project in BLDG 122 at the 144th Fighter Wing. The Contractor shall provide non-personal services, to include all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary to remove, replace, test, and balance five (5) Heating, Ventilation, and Air Conditioning (HVAC) units on the roof of Building 122 at Fresno Air National Guard Base (ANGB) and four (4) ductless mini split systems. Additional details are included in the provided Statement of Work.
Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as 100% set-aside for small business. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil
The magnitude of this requirement is between $200,000 and $350,000.
A site visit is tentatively scheduled for Thursday, 17 September at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided before the site visit. Refer to Attachment, Base Access Request, for additional instructions.
Questions should be submitted five (5) days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site.
As required by 15 U.S.C. § 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses:
(A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204.
(B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below:
Selected Agency: DEPT OF THE ARMY
Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts
30 days or less: 0
31 to 60 days: 1
61 to 90 days: 0
91 to 180 days: 0
181 to 365 days: 1
Greater than 365 days: 1
After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2
Notice to Offerors: This effort is a high priority requirement in support of the National Guard. Funds are not presently available to make award. If funds become available for award and prices are deemed fair and reasonable, it is the Government’s intent to make award. This is not a commitment of funds or contract award.
DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO CA
USPFO CA PROCUREMENT
W7MX USPFO ACTIVITY CAANG 144
W7MX USPFO ACTIVITY CAANG 144
KO FOR CAANG DO NOT DELETE
5323 E MCKINLEY FRESNO ANGB
FRESNO, CA, 93727-2199
NAICS
Plumbing, Heating, and Air-Conditioning Contractors
PSC
MODIFICATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)