Loading...
EEPZ254668
Response Deadline
May 6, 2026, 6:00 PM(CDT)15 days
Eligibility
Contract Type
Sources Sought
The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire design and replacement of the roof of building 155, replace the overhang covering the exhaust louver on the rear of the facility, and the overhang covering the entrance and roll up door on the front of the facility. The new roof and overhands shall eliminate each and every weather borne water leak into B155. The new roof shall be free from ponding. The new roof shall be insulated meeting ASHRAE zoning requirements for the facility. The new roof shall be a TPO single ply membrane roofing system. The work shall include but is not limited to: replacement of built up roof components down to roof decking, insulation, gutter system including downspouts, roof curbing, and roof coping. Perform all work according to this Statement of Work (SOW) and all related AF requirements and other codes and references.
Oscar Gonzalez
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR EDUCATION AND TRAINING COMMAND
FA3022 14 CONS LGCA
FA3022 14 CONS LGCA
ADMIN ONLY NO REQTN CP 662 434 7802
495 HARPE BLVD
COLUMBUS, MS, 39710-0001
NAICS
Roofing Contractors
PSC
REPAIR OR ALTERATION OF OFFICE BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)