Loading...
W912DR26BA004
Response Deadline
Jul 10, 2026, 8:00 PM(EDT)16 days
Eligibility
Contract Type
Presolicitation
The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027.
The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1-2 foot of allowable over depth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility.
The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 – 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
THE SOLICITATION IS SCHEDULED TO BE RELEASED ON/OR ABOUT 10 July 2026.
DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST BALTIMORE
W2SD ENDIST BALTIMORE
W2SD ENDIST BALTIMORE
CONTRACTING DIVISION
2 HOPKINS PLAZA
BALTIMORE, MD, 21201-2526
NAICS
Other Heavy and Civil Engineering Construction
PSC
MAINTENANCE OF DREDGING FACILITIES