W50S8W-26-Q0001
Response Deadline
Jun 30, 2026, 4:00 PM(MDT)29 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The vendor shall provide un-installation of outdated equipment
and installation of brand-new items according to acceptable standards. Contractor
shall provide Uninterruptible Power and Cooling Distribution Unit replacement/
installation and a Site Lead/Project Manager to provide the following critical tasks to
support to the WYANG per the PWS.
• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.
• 5.3.4 Demo existing piping
• 5.3.5 Run new Pex piping to the in-row coolers.
• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
Tie existing EPO into new Shunt Trip breaker.
• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &
locked out. Intercept existing Feeder to line side of new 350A Shunt Trip
Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt
Trip Breaker to new UPS.
• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old
UPS.
• 5.3.9 Install Power Modules and Battery Cabinets
• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to
move old UPS across floor & new UPS installed at old UPS location. All
raised floor modifications by others.
SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.
QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT
DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO WY
USPFO WY PROCUREMENT
W7N9 USPFO ACTIVITY WYANG 153
W7N9 USPFO ACTIVITY WYANG 153
KO FOR WYANG DO NOT DELETE
217 DELL RANGE BLVD
CHEYENNE, WY, 82009-4799
NAICS
All Other Miscellaneous Electrical Equipment and Component Manufacturing
PSC
MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)