PROJECT: WHITETAIL ROAD 224 CONSTRUCTION PROJECT
***THERE IS A SITE VISIT: READ THE SOLICITATION IN ITS ENTIRETY FOR FULL DETAILS & CONTACT INFORMATION****
Questions are due no later than May 6, 2026, at 9:00 a.m. Central Time. Quotes are due by June 3, 2026, at 9:00 a.m. Central Time. Questions and quotes shall be submitted via email to: Janice King at Janice.king@usda.gov and to Lucas Dahlman at lucas.dahlman@usda.gov by the established due dates and times.
Description of Work: Work for this project consists of constructing a roadway embankment with turnouts and lead-off ditches; installing specified multi-axial geogrid geosynthetic on approved constructed roadway; furnishing, placing and compacting the aggregate material base course on the geogrid; seeding and installing specified erosion control material; and a final shaping of the roadway as specified. Work will be performed on a designated 1.7 miles of Whitetail Road #224 per Base Item, with Optional Item of additional aggregate placement on Whitetail Road #224. Roadway will be constructed to a fourteen (14) foot wide roadway surface as Shown on the Drawings. Blade the placed aggregate to provide a smooth-running surface with a centerline crown. Reference (FP-24) Standard Specifications for Construction of Roads and Bridges as shown in the Specifications and Drawings. Work to be completed shall be as shown in the Statement of Work, Schedule of Items, Plans and Drawings and Specifications.
Janice King
Lucas Dahlman
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
USDA FOREST SERVICE-SPOC IM
USDA FOREST SERVICE-SPOC IM
SPOC Intermountain
1400 INDEPENDENCE AVE SW, MS-1138
Washington, DC, 202500001
NAICS
Highway, Street, and Bridge Construction
PSC
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS