FA664825C0007P00002
Response Deadline
Sep 24, 2026, 6:00 PM(EDT)14 days
Eligibility
Contract Type
Special Notice
This modification will add necessary alterations to ongoing construction to the Fire Traininer facility.
1. Demolition & Site Preparation: Demolish and dispose of the existing in-pond non-operational submersible pump; drain the retention pond and clear accumulated algae/debris.
2. Civil Foundation: Construct a new on-land reinforced concrete foundation pad for the relocated external pump system.
3. Mechanical & Engineering: Furnish and install a new external pump system, including signed/sealed Professional Engineer (PE) design drawings and Net Positive Suction Head (NPSH) calculations.
4. Electrical & Controls: Trench and install approximately 50 linear feet of new electrical conduit and wiring, integrating the pump system into the Fire Training Facility and the new CNOT (Control Tower).
The incumbent contractor, Guardian Construction, Inc., is currently mobilized on-site performing comprehensive mechanical, structural, and control construction to the Fire Trainer under Contract FA664825C0007. Awarding this modification on a sole source basis is the only viable method to prevent unacceptable operational delays, substantial duplication of costs, and ensure warranty and integration into existing system.
Viviane Filias
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
FA6648 482 LSS LGC
FA6648 482 LSS LGC
ADMINISTRATIVE ONLY NO REQUISITIONS
29050 CORAL SEA BLVD
HOMESTEAD AFB, FL, 33039-1299
NAICS
Industrial Building Construction
PSC
CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)