Loading...
FA485526Q0056
Response Deadline
Aug 11, 2026, 7:00 PM(MDT)12 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
Cannon AFB, NM requires a four-stage, EPA Method 319 (NESHAP) compliant paint booth exhaust filtration system for its Corrosion Control Facility to meet environmental air permit standards during painting operations.
CLIN 1: 15 EA (each) Polyester Prefilter Blankets (102" x 90" DD Series)
CLIN 2: 45 EA (each) 20 per case, Method 319 Compliant Exhaust Pads (24" x 24" Tacky or multi-layered exhaust filter panel (MEPT)
CLIN 3: 150 EA (each) 6 per case, Method 319 Compliant 6-Pocket Bag Filters (24" x 24")
CLIN 4: 1 EA (each) Pocket Poly-Carbon Cube Filters (24" x 24")
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE SPECIAL OPERATIONS COMMAND
FA4855 27 SOCONS LGC
FA4855 27 SOCONS LGC
ADMIN ONLY NO REQTN CP 575 784 2321
110 ALISON AVE BLDG 600
CANNON AFB, NM, 88103-5321
NAICS
Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
PSC
REFRIGERATION EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)