Loading...
N0018926QL196
Response Deadline
Aug 24, 2026, 5:00 PM(EDT)6 days
Eligibility
Contract Type
Solicitation
The instant requirement is for routine maintenance, repair, and purchasing of replacement parts for machines manufactured by TruFitness Equipment, Life Fitness Equipment, and Hammer Strength.
Scope
1. Provide preventative and corrective maintenance in accordance with the manufacturer’s recommendations.to the
following: Manufacture is TruFitness Equipment, Life Fitness Equipment and Hammer Strength.
a. Elliptical/Cross Trainer Machine (qty 4)
b. Treadmill (qty 5)
c. Flex strider (qty 3)
d. Upright Bike (qty 2)
e. Recumbent bike (qty 2)
f. Spinner Bike (qty 2)
g. Chest (Multi-Press) Exercise machine (qty 1)
h. Fly/rear deltoid/Pectoral machine (qty 1)
i. Leg curl and extension machine (qty 1)
j. abdominal machine (qty 1)
k. rower machines (qty 2),
l. Barbells (20lbs – 110 lbs. with rack) (qty 1 set)
m. Flat weight bench (qty 1)
n. Kettlebells (qty 1 set)
o. Vertical Smith (qty 1)
p. Plate Loaded Row (qty 1)
q. Olympic Squat Rack (qty 1)
r. Utility Bench (qty 1)
s. Plate Loaded Linear Leg Press (qty 1)
t. Olympic Flat bench (qty 1)
u. Plate Loaded Kneeling Leg Curl (qty 1)
v. Plate Loaded Leg Extension (qty 1)
2. Reupholster benches, pads, and other equipment/items on site with material that meets or exceeds the original
manufacturer fabric/vinyl/rubber.
3. Replace end caps, protective covers, and trim pieces as required on all equipment in the fitness center.
4. Perform parts replacement and sanding and painting as necessary to remove and prevent rust on metal parts.
5. Inspect all equipment in the fitness center and lubricate guide rods, pulleys, and any moving parts as appropriate per
manufacturer recommendations.
6. Provide a list of replacement parts required, with description of reason for replacement and replacement cost, to be
installed/replaced during the next scheduled visit, to keep all equipment in nominal operational order.
7. Services shall be performed quarterly in accordance with manufacturer’s frequency.
8. Provide up to a single visit per contract period to respond to defects that may need urgent attention due to a safety
issue such as exposed sharp edges, frayed electrical cables or other similar defect.
Security Requirements:
COMPLEX ACCESS AND ESCORTING
This PWS requires all contractor personnel to obtain a ‘green’ contractor badge. This badge allows the contractor
personnel to gain access to and remain inside the fitness center without needing a dedicated escort. This requires a
thorough background check be performed for all contractor personnel that must have access to accomplish the contract
DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSUP
NAVSUP GLOBAL LOGISTICS SUPPORT
NAVSUP FLC NORFOLK
NAVSUP FLT LOG CTR NORFOLK
NAVSUP FLT LOG CTR NORFOLK
ATTENTION CODE 301
1968 GILBERT STREET SUITE 600
NORFOLK, VA, 23511-3392
NAICS
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
MAINT/REPAIR/REBUILD OF EQUIPMENT- RECREATIONAL AND ATHLETIC EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)