W9123626BA006
Response Deadline
Sep 29, 2026, 6:00 PM(EDT)Today
Eligibility
Contract Type
Solicitation
Note: An Amendment 7 will be published today 29SEP to extend bids due date.
Amendment 0006: An amendment has been made to Solicitation W9123626BA0006. Please see attachment SF30, Solicitation Amendment W9123626BA006_0006. This amendment incoporates the revised solicitation documents dated August 31, 2026 in response to bidder inquiries. This amendment does not extend the bid due date and bid opening date. Please see the amendment for the complete summary of changes.
The purpose of this project is to construct 24 concrete turning pads, along with required site drainage improvements and road alignment and repair as necessary. The contract will be executed in three distinct phases, with the contractor granted access to only one phase at a time. Completion of each phase is required before proceeding to the next. The remaining phases (two and three) will only be performed if the options for phases are exercised. During construction activities in one phase, the Army will conduct training operations in the remaining two phases. Each turning pad, as identified in the project drawings, will require excavation of the existing roadbed and placement of concrete in accordance with the design specifications. Storm drainage systems will be installed to ensure positive site drainage throughout the construction process. Upon proper curing of the concrete turning pads, the connecting roads will be regarded and aligned to seamlessly integrate with the pads, as detailed in the contract drawings.
DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST NORFOLK
W2SD ENDIST NORFOLK
W2SD ENDIST NORFOLK
KO CONTRACTING OFFICE
803 FRONT STREET
NORFOLK, VA, 23510-1096
NAICS
Commercial and Institutional Building Construction
PSC
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set-Aside
8(a) Set-Aside (FAR 19.8)