12639526Q0210
Response Deadline
Aug 7, 2026, 5:00 PM(CDT)25 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially. Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system.
Solicitation documents are posted below.
NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required.
Amendment 1 is posted below.
RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed.
DEPARTMENT OF AGRICULTURE
ANIMAL AND PLANT HEALTH INSPECTION SERVICE
MRPBS MINNEAPOLIS MN
MRPBS MINNEAPOLIS MN
250 MARQUETTE AVENUE
SUITE 410
MINNEAPOLIS, MN, 55401
NAICS
Plumbing, Heating, and Air-Conditioning Contractors
PSC
CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)