W50SLF-26-R-A005
Response Deadline
Sep 16, 2026, 1:30 AM(HST)18 days
Eligibility
Contract Type
Presolicitation
Single Project RFP Set-Aside for Small Businesses
NAICS Code: 236220 – Commercial and Institutional Building Construction
The Hawaii National Guard intends to issue a Request for Proposals (RFP) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the Construction of “KNMD209085 Munitions Maintenance and Inspection (M&I) Facility” and “KNMD209086 Conventional Munitions Cube Storage Addition” located on the Hawaii Air National Guard campus, at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii. at JBPHH-HI.
KNMD209085 Munitions Maintenance and Inspection (M&I) Facility - Construct a new Munitions Maintenance & Inspections facility by utilizing conventional design and construction methods to accommodate the facility mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project – Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805.
Project square footage is estimated at 2,400 SF. Work covered in this project includes but is not limited to:
In addition to the base work described above, the solicitation will include the following option line items: 1. MAC Pad - Construct 1,167 SY concrete pad for the Material Assembly Center (MAC), required for constructing munitions, along with new asphalt pavement for access and egress to the facility's maintenance bays.
KNMD209086 Conventional Munitions Cube Storage Addition - Construct an addition to the Munitions Cube Storage Facility (B3552) utilizing conventional design and construction methods to support the F-22 mission. This project has a statutory cost limitation $14M for Unspecified Minor Military Construction (UMMC) Project – Adjustment of Dollar Limitations for Location pursuant to 10 USC §2805.
Project square footage is estimated at 1,320 SF. Work covered in this project includes but is not limited to:
APPLICABLE TO BOTH PROJECTS
RAB Lighting exterior wall packs and area lights are sole source/brand name specific for compatibility with existing installation systems (noted justifications will be included with solicitation).
Project Phasing & Security Gates: The contractor will be required to erect a temporary security fence around the construction zone in accordance with the project staging and phasing drawings.
Escort Requirements: Escort personnel shall be required when erecting the temporary security fence, performing work occurring outside the temporary security fence, and connecting utilities to the existing system.
Secured Zone Access: Once the temporary security fencing is approved and accepted by the Contracting Officer’s Representative (COR), no escort shall be required within the active secured work zone during construction, allowing the contractor to work within the secured boundary unimpeded.
The magnitude of construction is between $10,000,000 and $25,000,000. The magnitude of project KNMD209085 Munitions Maintenance and Inspection (M&I) Facility is more than $10,000,000 and project duration will be 459 calendar days after notice to proceed to include inspection and punch list. The magnitude of project KNMD209086 Conventional Munitions Cube Storage Addition is between $1,000,000 and $5,000,000 and project duration will be 285 calendar days after notice to proceed to include inspection and punch list. These projects are set aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 236220, with a small business size standard of $45,000,000.
The tentative date for issuing the solicitation is on-or-about 17 September 2026. The tentative date for the pre-proposal conference is on-or-about 24 September 2026, 08:30 am local time, location to be provided in the solicitation. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the preproposal conference. All questions for the pre-bid conference must be submitted by 21 September via email to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil.
The solicitation closing date is tentatively planned for on-or-about 21 October 2026. Actual dates and times will be identified in the solicitation. The source selection process will be conducted in accordance with the Source Selection Procedures described in FAR 15.2, DFARS 215.2, and AFARS 5115.2. Evaluation factors include Technical Capability, Past Performance and Price. The Government intends to award a contract without conducting discussions.
Interested offerors must be registered in the System for Award Management (SAM). To register go to www.SAM.gov. Instructions for registering are on the web page (there is no fee for registration).
The solicitation and associated information will be available only from the Contract Opportunities page at SAM.gov.
This solicitation is not an invitation for bids and there will not be a formal public bid opening. All inquiries must be in writing, preferably via email to the persons specified in the solicitation. All answers will be provided in writing via posting to SAM.gov. If you have any questions concerning this procurement you are encouraged to email your questions to cezar.y.deveas.mil@army.mil and copy to anthony.g.reyes1.civ@army.mil.
Your attention is directed to FAR clause 52.219-14(e)(3) (DEVIATION 2021-O0008), LIMITATIONS ON SUBCONTRACTING, which states “By submission of an offer and execution of a contract, the Offeror/Contractor agrees in performance of the contract for General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded”.
In accordance with RFO FAR 36.101-4, the following information is provided:
a. There are no agency-specific policies or procedures that apply to the definitization of equitable adjustments for change orders under construction contracts.
b. No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts.
DISCLAIMER: The official plans and specifications are located on the official Government webpage and the Government is not liable for information furnished by any other source. Amendments, if/when issued will be posted to Contract Opportunities for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible for various reasons. The Government is not responsible for any loss of Internet connectivity or for an offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO HI
USPFO HI PROCUREMENT
W7M4 USPFO ACTIVITY HIANG 154
W7M4 USPFO ACTIVITY HIANG 154
91 1179 ENTERPRISE AVE BLDG 117
KAPOLEI, HI, 96707-0000
NAICS
Commercial and Institutional Building Construction
PSC
CONSTRUCTION OF AMMUNITION STORAGE BUILDINGS
Set-Aside
No Set aside used