Loading...
FA822426Q0003_1
Response Deadline
Aug 4, 2026, 6:00 PM(MDT)19 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The Air Force is soliciting a 100% Small Business Set-Aside for a contractor to install and integrate a Government-furnished compressor and cooling system at Hill AFB, Utah.
Key Project Details:
The Work: The contractor will provide the labor, tools, and standard materials (piping, wiring, epoxy) to physically install two government-owned Ingersoll Rand compressors, dryers, and glycol coolers into Building 269 and connect them to the base's 460V power and air loop.
The Constraints: All primary machinery is Government Furnished Property (GFP). Facility drawings are Controlled Unclassified Information (CUI) requiring vetted SAM.gov access. Davis-Bacon prevailing wages apply.
Critical Deadlines:
Site Visit RSVP Deadline: 20 July 2026
Pre-Quote Site Visit: 23 July 2026
Contractor Q&A Deadline: 27 July 2026
Quotes Due: 04 August 2026
Mandatory Completion: On or before 17 August 2026 (Strict deadline to preserve the manufacturer's warranty).
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8224 AFSC OL H PZIM
FA8224 AFSC OL H PZIM
BLDG 1289 CP 801 777-8958
6038 ASPEN AVE
HILL AFB, UT, 84056-5805
NAICS
Plumbing, Heating, and Air-Conditioning Contractors
PSC
INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)