Loading...
191NLE26Q0101
Response Deadline
Sep 25, 2026, 7:00 PM(EDT)3 days
Eligibility
Contract Type
Solicitation
Sources Sought Notice: 191NLE26Q0101 - INL Kyiv GCS 200 Spare Parts
(PSC: 1385; NAICS: 811310)
QUOTES/PROPOSALS ARE DUE NO LATER THAN 3:00 PM EST ON MONDAY, SEPTEMBER 28, 2026. QUESTIONS PERTAINING TO THIS SOLICITATION SHALL BE ACCEPTED UNTIL 3:00 PM ON THURSDAY, SEPTEMBER 24. 2026.
Background:
The Bureau of International Narcotics and Law Enforcement Affairs (INL) is an instrumental leader in the development of policies and programs to combat international narcotics and crime. The requirement is to provide spare parts for eight (8) GCS-200 units This acquisition will help equip the partner nation with needed maintenance spare parts.
Interested contractors may provide the above information via e-mail to the addresses listed below. Information submitted must be in sufficient detail as to allow for a thorough government review.
PLEASE SEE THE FOLLOWING ATTACHMENTS FOR COMPLETE QUANTITIES, TECHNICAL SPECIFICATIONS, AND EVALUATION FACTORS:
1) PR15758246 SOW R1 (Statement of Work)
2) Attch 2 - Technical Evaluation Factors Supplemental
Primary Point of Contact:
Michele Coccovizzo
Senior Contract Support Specialist
CoccovizzoML@state.gov
Secondary Point of Contact:
Jamillah Timmons
Contracting Officer
TimmonsJ@state.gov
TECHNICAL SPECIFICATIONS:
The offeror is responsible for obtaining all equipment requested directly from the manufacturer, with no aftermarket parts. The offeror is fully responsible for the delivery of safe, fully operational spare parts. The spare parts offered must be for the GCS-200 systems, after market parts will not be accepted. (See attached Statement of Work for additional information)
SERVICE AND MAINTENANCE
All parts, accessories, service and equipment – if applicable for the above items shall be available in Ukraine and obtainable within reasonable period (1 year minimum)
APPLICABLE DOCUMENTS
Vendor will demonstrate a valid letter of representation from GCS authorizing sales to the United States Federal Government.
DELIVERY (SHIPPING AND HANDLING INSTRUCTIONS)
Delivery shall be made F.O.B. Destination as soon as possible but not later than one hundred and eighty (180) days from the date of contract award and in accordance with the instructions you receive from the Point of Contact (POC) (to be advised on award). FOB delivery shall be made coordinated with the COR and Dept of State Freight Forwarder Services (DFS).
This is a technical assistance project so no tax or custom fees are applied (project registration documents will be provided to vendors upon request).
Partial shipments of completed CLINs are authorized under close coordination with the Contracting Officer or the Contracting Officer’s Representative (COR). Once equipment has been properly inventoried, confirmed, palletized by the vendor then DFS will pick up pallets and prepare for shipment into Ukraine.
Improperly marked shipments may be rejected by the Government, and the contractor shall be solely responsible for all costs associated with said deliveries and any required redeliveries. Boxes will be marked with color-specific labels (ex. Green) that properly identifies the end user. The contractor must consult with the Government on proper pallet marking prior to delivery. All deliveries from manufacturers will be consolidated in Stockach, Germany by the vendor.
Examples of box and pallet markings are:
AMERICAN EMBASSY
INL Kyiv – POC Information
Order No.: TBD
CLIN
Description
Box #__ of __
Partner:
Note: Each partner will have its own marking (color label). This information will be issued by COR post award.
PLEASE NOTE:
All orders are ultimately intended for an overseas destination. If the shipment contains wood packaging material, the packing and palletizing must conform to the International Standard for Phytosanitary Measures Publication No. 15: “Guidelines for Regulating Wood Packaging Material in International Trade” (ISPM 15) and have the appropriate markings indicating that the packing materials meet this standard. Any deliveries arriving at our indicated domestic delivery address that do not meet these standards will be rejected and shall be corrected at the contractor’s expense.
Warranty:
To facilitate expeditious return of warranty items and to avoid delays in the warranty process, the offeror shall provide within 30 days of notification of a warranty action the required information to facilitate shipping of warranty items to manufacturer. This includes, but is not limited to, information to ensure full compliance with ITAR regulations and no delay in providing the Reference RA# and a shipping address.
Customs Clearance and Tax Exemptions:
If applicable, the U.S. Government will assist the Contractor in obtaining customs clearance in Colombia and tax exemption certificates from the Government of Ukraine in accordance with the packing, marking, and submission of documents as instructed herein.
Export License:
The Contractor shall comply with Sections 38-40 of the Arms Export Control Act (AECA) (22 U.S.C. 2778-2780) and the International Traffic in Arms Regulations (ITAR) (22 CFR Parts 120-130) as required, for the prosecution of work under this contract at no additional cost to the Government. Failure to be in compliance with AECA and ITAR by date planned for commencement of contract performance as well as during the entire performance of work under this contract may result in contract termination. Any penalties rendered to the Contractor, as a direct result of being found non-compliance with AECA and ITAR will be the responsibility of the Contractor. The contractor is responsible for producing all required paperwork and obtaining all required Export Licenses. For additional information on AECA and ITAR, see http://www.pmddtc.state.gov/.
Inspection And Acceptance:
The equipment shall be received from vendor warehouse in United States where it will be consolidated for shipping / pick up by INL freight forwarder. The packing list of all equipment shall include at a minimum: description, brand name, serial number (if any), weight, and quantities. Partial Deliveries of completed contract line-item numbers (CLINs) will be accepted.
A factory / warehouse visit may be conducted by INL COR and/or delegated representatives to evaluate quality assurance, quality control, shipping control, physical inspection of randomly selected finished items prior to shipping.
PERIOD OF PERFORMANCE (POP)
Performance period for this potential contract will be no more than 180 days from the date of award. The Contractor shall interpret any reference made to days, as calendar days.
ADDITIONAL INSTRUCTIONS TO OFFERORS:
At a MINIMUM, proposal/quote must include:
Michele Coccovizzo
Jamillah Timmons
DEPARTMENT OF STATE
DEPARTMENT OF STATE
ACQUISITIONS - INL
ACQUISITIONS - INL
US DEPT OF STATE, 2201 C ST NW
WASHINGTON, DC, 20520
NAICS
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
SURFACE USE EXPLOSIVE ORDNANCE DISPOSAL TOOLS AND EQUIPMENT
Set-Aside
No Set aside used