FA822426Q0003
Response Deadline
Aug 4, 2026, 6:00 PM(MDT)19 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The Air Force is soliciting a 100% Small Business Set-Aside for a construction contractor to install and integrate a Government-furnished compressor and cooling system at Hill AFB, Utah.
Key Project Details:
The Work: The contractor will provide the labor, tools, and standard materials (piping, wiring, epoxy) to physically install two government-owned Ingersoll Rand compressors, dryers, and glycol coolers into Building 269 and connect them to the base's 460V power and air loop.
The Constraints: All primary machinery is Government Furnished Property (GFP). Facility drawings are Controlled Unclassified Information (CUI) requiring vetted SAM.gov access. Davis-Bacon prevailing wages apply.
Critical Deadlines:
Pre-Quote Site Visit: 27 July 2026
Quotes Due: 04 August 2026
Mandatory Completion: 17 August 2026 (Strict deadline to preserve the manufacturer's warranty).
See the attached RFQ and other supporting documents for more informations.
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8224 AFSC OL H PZIM
FA8224 AFSC OL H PZIM
BLDG 1289 CP 801 777-8958
6038 ASPEN AVE
HILL AFB, UT, 84056-5805
NAICS
Plumbing, Heating, and Air-Conditioning Contractors
PSC
INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)