Loading...
36C25526Q0570
Response Deadline
Aug 10, 2026, 4:00 PM(CDT)7 days
Eligibility
Contract Type
Sources Sought
STATEMENT OF WORK
SOW as of: 6/3/2026
2. Contract Title
Radiation Therapy Quality Management System Deployment and Training.
3. Background
The VA Medical Center – Overland Park requires a comprehensive software system to support quality assurance for radiotherapy treatment delivery and associated treatment machines. This effort will enable the facility to improve patient safety by verifying that radiotherapy treatment machines operate within defined tolerances and by supporting routine and patient‑specific quality assurance workflows.
The work described in this SOW covers the initial deployment, configuration, and clinical adoption support for a new quality management software system for linear accelerators and related oncology information systems. It includes remote installation, configuration, verification, training, and adoption support necessary to achieve clinical “go‑live” at the VA Medical Center – Overland Park.
4. Scope
The scope of this SOW includes all contractor activities necessary to deploy the radiation therapy quality management software system in the VA Medical Center – Overland Park production environment, configure it for use with existing treatment machines and oncology information systems, verify correct operation, train clinical and technical staff, and support adoption through initial clinical use.
The work will be performed primarily via remote services, with coordination among Medical Center project leadership, information technology staff, and clinical staff. The scope is limited to the Medical Center’s production data center and associated radiotherapy equipment and does not extend to other facilities or systems beyond those explicitly identified herein.
5. Specific Tasks
5.1 Task 1 – Project Management and Initiation
The contractor shall provide project management services to plan, coordinate, and oversee all deployment activities. This includes identification of key project personnel (Executive Sponsor, Project Manager, IT Lead, and Clinical Lead), development of a communication plan, and coordination of all dependencies required to initiate the project.
Subtask 5.1.1 – Project Initiation
Deliverables (Task 1):
5.2 Task 2 – System Installation and Environment Configuration
The contractor shall perform remote installation of the quality management software system to the latest approved version on the Medical Center’s designated production server(s) in a new virtual environment.
Subtask 5.2.1 – Pre‑Installation Validation
Subtask 5.2.2 – Software Installation
Subtask 5.2.3 – Security and Connectivity Configuration
Deliverables (Task 2):
5.3 Task 3 – Machine Configuration and Verification
Following installation, the contractor shall configure the software system for the Medical Center’s treatment machines (linear accelerators) and perform verification testing.
Subtask 5.3.1 – Machine Configuration
Subtask 5.3.2 – Machine Verification
Deliverables (Task 3):
5.4 Task 4 – Interface with Oncology Information System (OIS)
The contractor shall assist with establishing remote connection between the quality management system and the existing oncology information system instance used by the VA Medical Center – Overland Park.
Subtask 5.4.1 – OIS Connectivity
Deliverables (Task 4):
5.5 Task 5 – Clinical Application Education
The contractor shall provide remote and/or on‑site education services to support clinical use of the quality management system. The Medical Center has purchased six education units, where one unit equals a four‑hour remote instructor‑led session, with a minimum of two days (six units) required to schedule an on‑site event.
Subtask 5.5.1 – Education Planning and Preparation
Subtask 5.5.2 – Product Training
Deliverables (Task 5):
5.6 Task 6 – Adoption Support and Clinical Go‑Live
The contractor shall support the Medical Center’s adoption of the system through a defined post‑training period, culminating in clinical go‑live.
Subtask 5.6.1 – Adoption Planning
Subtask 5.6.2 – Remote Adoption Support
Subtask 5.6.3 – Project Completion and Transition
Deliverables (Task 6):
6. Performance Monitoring
The COR will monitor contractor performance through review of deliverables, participation in status meetings, and verification that milestones (installation complete, verification complete, training complete, client testing complete, and clinical go‑live) are achieved in accordance with the agreed project schedule.
Contractor performance will be considered acceptable when all tasks are completed, the system is operational in the production environment, necessary interfaces and machine configurations are verified, staff training is complete, and the Medical Center has documented acceptance of clinical use.
7. Security, Privacy, and Access Requirements
Contractor personnel will require remote access to designated servers to perform installation, configuration, and support activities; such access shall be provided in accordance with VA and facility policies. Service accounts created for the system (for example, administrative and database service accounts) must be configured to avoid password expiration or unmanaged changes that would disrupt system operation; changes that impact connectivity may require additional remote support sessions.
The Medical Center will ensure that applicable VA security, privacy, and information protection requirements are followed, including completion of any required VA forms and background checks, as directed by the Information Security Officer (ISO).
8. Government‑Furnished Equipment (GFE) / Government‑Furnished Information (GFI)
The VA Medical Center – Overland Park will provide:
No contractor‑furnished hardware is included in this SOW.
9. Other Pertinent Information or Special Considerations
10. Place of Performance
Place of performance is primarily remote, with work performed via secure remote access to the VA Medical Center – Overland Park systems. When on‑site services are scheduled (e.g., on‑site training), work will occur at:
VA Medical Center – Overland Park
10500 Mastin Rd
Overland Park, KS 66212
11. Period of Performance
The period of performance will commence upon issuance of the purchase order and project kick‑off. Deployment activities, including installation, configuration, verification, training, and adoption support, are expected to be completed within approximately four months from project kick‑off, with final duration dependent on project complexity and resource availability. Education and deployment services expire one year from project kick‑off date.
12. Delivery Schedule (Key Milestones)
SOW Task
Deliverable / Milestone
Due Date (Calendar Days After CO Start)
5.1
Project communication plan and schedule
Within 14 days of order completion
5.2
Installation complete
Within 6 weeks after accurate data confirmed
5.3–5.4
Machine and OIS configuration and verification
Within 4 weeks of project kick‑off
5.5
Training complete
Within 2 weeks after verification
5.6
Client testing complete and clinical go‑live
Duration dependent on module complexity, generally ≤ 90 days
5.6
Final status report and Project Acceptance Form
Upon successful clinical go‑live
Specific dates will be finalized in the project schedule at initiation.
13. Change Management
Any change to the scope, requirements, technical components, schedule, or costs described in this SOW shall require a formal, written change request. The change request shall describe the requested change, identify required actions to execute the change, estimate impacts to schedule and cost, and include signatures/approvals from both parties before implementation.
STATEMENT OF WORK
SOW as of: 6/3/2026
2. Contract Title
Radiation Therapy Quality Management System Deployment and Training.
3. Background
The VA Medical Center – Overland Park requires a comprehensive software system to support quality assurance for radiotherapy treatment delivery and associated treatment machines. This effort will enable the facility to improve patient safety by verifying that radiotherapy treatment machines operate within defined tolerances and by supporting routine and patient‑specific quality assurance workflows.
The work described in this SOW covers the initial deployment, configuration, and clinical adoption support for a new quality management software system for linear accelerators and related oncology information systems. It includes remote installation, configuration, verification, training, and adoption support necessary to achieve clinical “go‑live” at the VA Medical Center – Overland Park.
4. Scope
The scope of this SOW includes all contractor activities necessary to deploy the radiation therapy quality management software system in the VA Medical Center – Overland Park production environment, configure it for use with existing treatment machines and oncology information systems, verify correct operation, train clinical and technical staff, and support adoption through initial clinical use.
The work will be performed primarily via remote services, with coordination among Medical Center project leadership, information technology staff, and clinical staff. The scope is limited to the Medical Center’s production data center and associated radiotherapy equipment and does not extend to other facilities or systems beyond those explicitly identified herein.
5. Specific Tasks
5.1 Task 1 – Project Management and Initiation
The contractor shall provide project management services to plan, coordinate, and oversee all deployment activities. This includes identification of key project personnel (Executive Sponsor, Project Manager, IT Lead, and Clinical Lead), development of a communication plan, and coordination of all dependencies required to initiate the project.
Subtask 5.1.1 – Project Initiation
Deliverables (Task 1):
5.2 Task 2 – System Installation and Environment Configuration
The contractor shall perform remote installation of the quality management software system to the latest approved version on the Medical Center’s designated production server(s) in a new virtual environment.
Subtask 5.2.1 – Pre‑Installation Validation
Subtask 5.2.2 – Software Installation
Subtask 5.2.3 – Security and Connectivity Configuration
Deliverables (Task 2):
5.3 Task 3 – Machine Configuration and Verification
Following installation, the contractor shall configure the software system for the Medical Center’s treatment machines (linear accelerators) and perform verification testing.
Subtask 5.3.1 – Machine Configuration
Subtask 5.3.2 – Machine Verification
Deliverables (Task 3):
5.4 Task 4 – Interface with Oncology Information System (OIS)
The contractor shall assist with establishing remote connection between the quality management system and the existing oncology information system instance used by the VA Medical Center – Overland Park.
Subtask 5.4.1 – OIS Connectivity
Deliverables (Task 4):
5.5 Task 5 – Clinical Application Education
The contractor shall provide remote and/or on‑site education services to support clinical use of the quality management system. The Medical Center has purchased six education units, where one unit equals a four‑hour remote instructor‑led session, with a minimum of two days (six units) required to schedule an on‑site event.
Subtask 5.5.1 – Education Planning and Preparation
Subtask 5.5.2 – Product Training
Deliverables (Task 5):
5.6 Task 6 – Adoption Support and Clinical Go‑Live
The contractor shall support the Medical Center’s adoption of the system through a defined post‑training period, culminating in clinical go‑live.
Subtask 5.6.1 – Adoption Planning
Subtask 5.6.2 – Remote Adoption Support
Subtask 5.6.3 – Project Completion and Transition
Deliverables (Task 6):
6. Performance Monitoring
The COR will monitor contractor performance through review of deliverables, participation in status meetings, and verification that milestones (installation complete, verification complete, training complete, client testing complete, and clinical go‑live) are achieved in accordance with the agreed project schedule.
Contractor performance will be considered acceptable when all tasks are completed, the system is operational in the production environment, necessary interfaces and machine configurations are verified, staff training is complete, and the Medical Center has documented acceptance of clinical use.
7. Security, Privacy, and Access Requirements
Contractor personnel will require remote access to designated servers to perform installation, configuration, and support activities; such access shall be provided in accordance with VA and facility policies. Service accounts created for the system (for example, administrative and database service accounts) must be configured to avoid password expiration or unmanaged changes that would disrupt system operation; changes that impact connectivity may require additional remote support sessions.
The Medical Center will ensure that applicable VA security, privacy, and information protection requirements are followed, including completion of any required VA forms and background checks, as directed by the Information Security Officer (ISO).
8. Government‑Furnished Equipment (GFE) / Government‑Furnished Information (GFI)
The VA Medical Center – Overland Park will provide:
No contractor‑furnished hardware is included in this SOW.
9. Other Pertinent Information or Special Considerations
10. Place of Performance
Place of performance is primarily remote, with work performed via secure remote access to the VA Medical Center – Overland Park systems. When on‑site services are scheduled (e.g., on‑site training), work will occur at:
VA Medical Center – Overland Park
10500 Mastin Rd
Overland Park, KS 66212
11. Period of Performance
The period of performance will commence upon issuance of the purchase order and project kick‑off. Deployment activities, including installation, configuration, verification, training, and adoption support, are expected to be completed within approximately four months from project kick‑off, with final duration dependent on project complexity and resource availability. Education and deployment services expire one year from project kick‑off date.
12. Delivery Schedule (Key Milestones)
SOW Task
Deliverable / Milestone
Due Date (Calendar Days After CO Start)
5.1
Project communication plan and schedule
Within 14 days of order completion
5.2
Installation complete
Within 6 weeks after accurate data confirmed
5.3–5.4
Machine and OIS configuration and verification
Within 4 weeks of project kick‑off
5.5
Training complete
Within 2 weeks after verification
5.6
Client testing complete and clinical go‑live
Duration dependent on module complexity, generally ≤ 90 days
5.6
Final status report and Project Acceptance Form
Upon successful clinical go‑live
Specific dates will be finalized in the project schedule at initiation.
13. Change Management
Any change to the scope, requirements, technical components, schedule, or costs described in this SOW shall require a formal, written change request. The change request shall describe the requested change, identify required actions to execute the change, estimate impacts to schedule and cost, and include signatures/approvals from both parties before implementation.
DEPARTMENT OF VETERANS AFFAIRS
DEPARTMENT OF VETERANS AFFAIRS
255-NETWORK CONTRACT OFFICE 15 (36C255)
255-NETWORK CONTRACT OFFICE 15 (36C255)
VA MEDICAL CENTER
4101 SOUTH 4TH STREET
LEAVENWORTH, KS, 66048
NAICS
Hardware Manufacturing
PSC
ELECTRICAL HARDWARE AND SUPPLIES
Set-Aside
No Set aside used