USACE Seattle District has a requirement to convert two (2) existing barracks buildings into operational facilities for 3 tier levels of command. These buildings in general are referred as “the Hammer Heads”. The Hammer Handles have three (3) floors with a crawl space at grade elevation. The Hammer Heads are single floor. The Basement area with a main utility mechanical & electrical room extends partially under both the Hammer Head and the Hammer Handle.
The definitive removal / demolition work items for each building will require:
a) Hazardous material / debris abatement and removal mostly within the crawl space
b) Partial at ~ 75% removal / demolition of exterior building envelope, interior walls, etc.
c) Removal at ~ 90% removal of building mechanical – electrical systems
d) Removal of the existing roof EPDM system (but not the roof framing structure)
The definitive repair / new work items for each building will require:
e) New exterior envelope
f) New building mechanical – electrical systems
g) New Thermoplastic Polyolefin (TPO) Roof system
h) Painting of exteriors
Other considerations for site work coordination:
i) New utility connections (mostly by other entities)
j) Shared construction boundaries with adjacent current and future projects
Shawna West
DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
ENDIST SEATTLE
W071 ENDIST SEATTLE
W071 ENDIST SEATTLE
KO CONTRACTING DIVISION
4735 EAST MARGINAL WAY SOUTH
SEATTLE, WA, 98134-2329
NAICS
Commercial and Institutional Building Construction
PSC
CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)