Loading...
36C25526Q0629
Response Deadline
Sep 3, 2026, 4:00 AM(CDT)8 days
Eligibility
Contract Type
Solicitation
SCOPE OF WORK
1.0 Introduction
This Statement of Work (SOW) defines the requirements of the Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla in establishing a fixed-price order for electrosurgical units and smoke evacuation systems.
1.1 Background
Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla requires electrosurgical units and smoke evacuation systems to outfit the new facility and provide services for the VA.
1.2 Scope
The scope of this purchase order is to provide Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla with the products outlined for delivery to the Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla location. Contractors shall furnish all requirements.
The initial delivery will be to an offsite warehouse to support installation timelines. The warehouse location has yet to be determined. The warehouse will be available June 1st, 2026 – May 31st,2027. Initial Outfitting Transition and Activation team will be responsible for delivery to Rolla Super CBOC with estimated delivery dates are November 2nd, 2026 – January 8th, 2027. Specific installation dates will be defined upon award.
The delivery schedule is based upon the current construction schedule, which is subject to change. The vendor shall not increase prices for a change in delivery date due to construction delays. The awardees’ actual delivery dates will be confirmed by VA upon award.
The Contractor shall provide services and support at the locations identified in this Scope of Work. The Government reserves the right to add, remove, or modify locations and facilities as mission requirements evolve across the current and future operational footprint. The Contractor shall accommodate these changes within the scope of the contract without disruption to services. Any adjustments to pricing, schedule, or resources resulting from such changes shall be addressed through the appropriate contractual modification process in accordance with the applicable Changes clause
2.0 General Requirement
All equipment to be supplied under the specifications shall be the newest and the most current model of a standard product of a manufacturer of record. The products provided must meet or exceed the specifications laid out in the sections. A manufacturer of record is defined as a company whose main occupation is the manufacture for sale of the items of equipment and which:
a. Maintains a factory production line.
b. Maintains a stock of replacement parts for the item.
c. Maintains engineering drawings, specifications, operating manuals and maintenance manuals.
d. Has published and distributed descriptive literature and equipment specifications on the equipment.
Any equipment or service as applicable must be in compliance with the Memorandum dated March 6th 2025 Subject: Electronic Health Record Modernization Standardization (VIEWS 12862405).
Requirements:
Description/Part Number*
M3175 - Electrosurgical Unit, Dual Output, with mobile stand
M8523 - Evacuation System, Smoke, Surgical
Delivery & Installation
Specifications:
13063 Old Wire Rd
Rolla, MO 65401-000
3.0 Work Hours:
Normal business hours are 8:00AM to 4:30PM Monday thru Friday excluding Federal Holidays. Work completed outside this time shall be requested through the point of contact.
4.0 Delivery and Receiving:
Delivery and receipt of the proposed items is anticipated to be directed to the warehouse, which is to-be-determined. Confirmation of delivery location will be provided by the VA POC post-award. Delivery must be coordinated with VA Activations POC. Any item that has not been coordinated will be turned away and any additional charges will be the responsibility of the sender/transportation company.
Vendor Delivery paperwork requirements:
Vendors must provide packing slips with a line-by-line inventory for each item in the delivery to include description and serial number for each item so that items can be entered into the VA property book upon arrival to site or warehouse.
5.0 Period of Performance:
Period of performance will be from November 2nd, 2026 – January 31st, 2027, giving the vendor time deliver the product and install, to each listed location, after award.
6.0 Installation
The contractor shall be responsible for the installation, performance verification and validation of the equipment with a VA Activations member who will accept the equipment.
All requested products shall be completely manufactured as specified and delivered to the respective delivery locations as described above.
Protection of Existing Structures, Equipment, Utilities, and Improvements:
7.0 Warranty and Support:
The contractor shall provide a manufacture’s two-year, free replacement warranty on units with normal wear and tear, including free return shipping, from date of delivery.
8.0 Use of Premises
If during the performance of this contract, work will be carried out on Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla premises, the vendor shall perform all work in such a manner that will cause a minimum interference with operations and the operations of other contractors on the premises.
The vendor shall communicate through the VA POC any required coordination requirements with the General Construction contractor prior to and during delivery and installation activities.
The project may be an active construction site during delivery and installation. The vendor shall take all necessary precautions to protect the premises and all persons and property therein from damage or injury. The vendor shall assume responsibility for taking precautions for the vendor's (and associated subcontractors’) employees, agents, licensees, and permittees. The vendor shall abide by any safety requirements imposed by the GC (e.g. hard hats, safety vests).
9.0 GOVERNMENT AND CONTRACTOR RESPONSIBILITIES
VA shall provide the contractor with copies of documents that the VA is required to provide.
The contractor shall request other VA documentation deemed pertinent to the work accomplishment directly from the COR. The contractor is expected to use common knowledge and resourcefulness in securing all other reference materials, standard industry publications, and related materials that are pertinent to the work.
The contractor shall maintain frequent communications with the Program Office and the COR to conduct work in progress reviews if necessary. Progress reports shall be delivered electronically to the COR, with an electronic courtesy copy to the activations PM.
The contractor assumes full responsibility for the delivery of the goods and shall assume all the duties, responsibilities and obligations associated with the prime contractor.
The contractor assumes liability for its subcontractors and shall ensure that its subcontractors shall comply in all respect with the relevant terms of this agreement to the extent that it or they are retained by the Contractor.
The contractor shall deliver the goods to the Harry S Truman VA Medical Center - Multi-Specialty CBOC – Rolla locations listed in section 4.0 Delivery Requirements.
Ashley N Schmitt, Contracting Officer
DEPARTMENT OF VETERANS AFFAIRS
DEPARTMENT OF VETERANS AFFAIRS
255-NETWORK CONTRACT OFFICE 15 (36C255)
255-NETWORK CONTRACT OFFICE 15 (36C255)
VA MEDICAL CENTER
4101 SOUTH 4TH STREET
LEAVENWORTH, KS, 66048
NAICS
Surgical and Medical Instrument Manufacturing
PSC
MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES
Set-Aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)