Response Deadline
Aug 13, 2026, 8:00 PM(MDT)14 days
Eligibility
Contract Type
Sources Sought
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs must submit the following by e-mail to cflacquisitions@dot.gov (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on August 13, 2026:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the ND OMAD 2025(1) project in which contractor performed work in roadway reconditioning and placing aggregate surface course on roadways. Experience in construction phasing, temporary traffic control, and timely completion of construction is required. State whether the firm was the prime contractor or subcontractor on the project.
DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
Project Details:
ND OMAD 2025(1) Minuteman Missile Access Roads
The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in 6 counties within North Dakota.
In cooperation with the Minot Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling approximately 50 miles of existing gravel Minuteman Missile Access Roads plus any road sections not constructed as part of ND OMAD 2024(1) in various counties within North Dakota, as well as the replacement of up to 27 culverts and subgrade repairs. The intent of this project is to provide necessary aggregate road maintenance and culvert replacement for select routes utilized by the United States Air Force.
The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of up to 27 culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
The project will be procured under the FPVS (Fixed-Price Variable Scope) contracting method and includes approximately 50 miles of variable scope roadway reconditioning and re-graveling, and up to 27 culverts of variable scope in length. The project PS&E will provide a prioritized schedule of roadways to be improved that includes roadway reconditioning and re-graveling of existing aggregate surface roads within the existing roadway bench; as well as the replacement of up to 27 culverts and subgrade repairs.
PRINCIPAL WORK ITEMS:
ANTICIPATED SCHEDULE:
It is anticipated that this project will be advertised in September 2026 and be under construction in May 2027. The project has an estimated completion date of September 2027.
ESTIMATED COST RANGE:
Total estimated cost between $2,000,000 and $5,000,000
Eric Grosskreuz
Leslie N. Karsten
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI
6982AF CENTRAL FEDERAL LANDS DIVISI
12300 W. DAKOTA AVE
LAKEWOOD, CO, 80228
NAICS
Highway, Street, and Bridge Construction
PSC
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS