Loading...
W91238269A001
Response Deadline
May 11, 2026, 10:00 PM(MDT)10 days
Eligibility
Contract Type
Special Notice
SPECIAL NOTICE
For Progressive Design-Build (PDB) under Other Transaction Authority (OTA)
Project: Little Mountain Testing Facility (LMTF), Hill Air Force Base (HAFB), Utah (UT)
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for LMTF using Progressive Design-Build under 10 USC §2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.
USACE intends to conduct an Industry Day on 14 May 2026 to provide an overview of the project, acquisition strategy, and anticipated requirements. This event will offer interested parties an opportunity to gain additional insight, ask questions, and provide input in advance of the solicitation release.
This Industry Day will be conducted virtually, please Click Here to sign up to attend this industry day by 11 May 2026 4:00PM Mountain time. Virtual link will be provided two days prior to the Virtual event.
Project Overview
The primary goal is to construct a 50,000 sq ft facility to house expanded testing capabilities in support of the Sentinel program at the Little Mountain Testing Facility. The facility is critical for meeting future Nuclear Hardness mission requirements.
Key components of the construction include:
The new facility will house advanced testing equipment, including the Advanced Radiation Environment Simulator (ARES) and a 14 MeV neutron generator, to provide dose rate and total dose testing for parts, modules, and entire systems.
The USACE will use a streamlined competitive selection process:
The agreement will be awarded to the most qualified progressive design-build entity (PDBE) to provide design development, preconstruction services, and construction. Post-award Phase 1 of PDB includes Design and Pre-construction services and Post-award Phase 2 includes the final design and construction. The agreement will be Firm-Fixed-Price (FFP). The FFP for successive design and construction milestones will be agreed to as the design progresses and funds are available.
1. General Requirement and Authority
b. Required Level: The Government has determined that this project requires a Cybersecurity Maturity Model Certification (CMMC) Status of Level 1 (Self-Assessment). Performance under the resulting Agreement will require the handling of Federal Contract Information (FCI). Interested parties must have achieved a Final Level 1 (Self-Assessment) Status and, at the time of award, affirm completion of the required self-assessment and attestation.
All interested parties should monitor the official solicitation announcement, which will provide complete details and submission instructions. Draft documents may be provided at a future date for feedback and informational purposes only and are subject to change upon issuance of the formal Program Solicitation.
Michelle spence
Natalia Gomez
DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH PACIFIC
ENDIST SACRAMENTO
W075 ENDIST SACRAMENTO
W075 ENDIST SACRAMENTO
KO CONTRACTING DIVISION
1325 J STREET
SACRAMENTO, CA, 95814-2922
NAICS
Industrial Building Construction
PSC
CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Set-Aside
No Set aside used