Loading...
SPRDL1-24-R-0166
Response Deadline
Oct 16, 2026, 9:00 PM(EDT)31 days
Eligibility
Contract Type
Solicitation
** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference:
Packaging - Attachment 15 Question(s)
1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere?
2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D?
The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I’m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump.
If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173.
3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant.”
I’m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn’t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer.
As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract.
*** Amendment 0005 is issued to extend the proposal due date out to 16 Oct 2026, change the FOB point from Origin to Destination for the production CLINs, revise the Section C Statement of Work (SOW) to remove references to Provisioning, Publications, and Technical Manuals, revise the list of addenda and attachments in Section J, remove select CDRLs and attachments as required, add a CDRL for a Commercial Off-the Shelf (COTS) Operator's Manual in Section J for government review prior to approval, and add/delete or update any clauses or provisions as required (especially due to the revolutionary FAR overhaul).
*** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 ***
*** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 ***
*** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 ***
*** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 ***
Item: Pumping Assembly, Water
NSN: 4320-01-691-1630
P/N: M53051-2-2 (CAGE 81349, Government)
Qty: 14 each basic, 14 each option
Packaging: Military A
FOB: Destination
Contract Type: Definitive contract with 100% option for 365 days
Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of packaging data, safety/security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 7 CDRLs and 7 attachments that support the CDRLs. Thoroughly review the solicitation document and amendments for all requirements prior to submitting your proposal.
***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****
DLA Warren Contract Opportunities
DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
DLA LAND
DLA LAND WARREN MICHIGAN
DLA LAND WARREN
DLA LAND WARREN
ZGA
6501 EAST ELEVEN MILE ROAD
WARREN, MI, 48397
NAICS
Measuring, Dispensing, and Other Pumping Equipment Manufacturing
PSC
POWER AND HAND PUMPS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)