6982AF25B000004
Response Deadline
Sep 30, 2026, 8:00 PM(MDT)15 days
Eligibility
Contract Type
Presolicitation
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE
Full and Open Competition with a HUBZone Set-Aside
PROJECT DESCRIPTION: ND NP THRO 204(1) Buck Hill Road
Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road. The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one (1) base schedule and no options.
SCOPE OF THE WORK:
The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot.
The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage.
The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package.
Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses. The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area.
Project restrictions include the following:
PRINCIPAL WORK ITEMS:
Approximate quantities for major work items:
ANTICIPATED SCHEDULE:
Advertisement – October 2026
Award - January 2027
Construction – April 2027 through November 2027
ESTIMATED COST RANGE:
Between $5,000,000 and $10,000,000
Kelly Palmer
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
6982AF CENTRAL FEDERAL LANDS DIVISI
6982AF CENTRAL FEDERAL LANDS DIVISI
12300 W. DAKOTA AVE
LAKEWOOD, CO, 80228
NAICS
Highway, Street, and Bridge Construction
PSC
CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Set-Aside
No Set aside used