Loading...
EEPZ254657
Response Deadline
Jun 16, 2026, 5:00 PM(EDT)14 days
Eligibility
Contract Type
Sources Sought
The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of the membrane roof system (including roof decking) section in front of the upper floor mechanical room building 708 Kaye Auditorium. The new roof shall be free from ponding; the new roof shall be insulated to meet ASHRAE zoning requirements for the facility. The new roof shall be a TPO single ply-membrane roofing system. The work shall include but is not limited to replacement of existing membrane roof components down to roof decking, insulation, gutter system including down spout attached to the membrane roof, and roof coping. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
Oscar Gonzalez
Willie Common
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR EDUCATION AND TRAINING COMMAND
FA3022 14 CONS LGCA
FA3022 14 CONS LGCA
ADMIN ONLY NO REQTN CP 662 434 7802
495 HARPE BLVD
COLUMBUS, MS, 39710-0001
NAICS
Roofing Contractors
PSC
REPAIR OR ALTERATION OF OFFICE BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)