This project consists of providing all materials, equipment, labor, transportation,
mobilization/demobilization, and incidentals for crack sealing and applying Fog Seal (emulsified
asphalt seal coat) to the asphalt at the Prescott Fire Center airtanker base/ light fixed wing ramp
and helibase.
Before Fog Seal is applied, all existing asphalt and concrete tarmac markings on the airtanker base
ramp and helibase will require Hydro Blasting to completely remove all markings and striping.
Before removing all markings and striping, contractors are encouraged to take photos and
dimensions of all existing markings and striping. Note: The Contractor shall be responsible for
accurate field measurements all striping and markings before their replacement. All replaced
striping and markings
Thomas Tran
DEPARTMENT OF AGRICULTURE
FOREST SERVICE
STEWARDSHIP CONTRACTING BRANCH USDA-FS
USDA-FS, STEWARDSHIP CONTRACTING BRANCH
1400 Independence AVE SW MS-1138
Washington, DC, 202501138
NAICS
Highway, Street, and Bridge Construction
PSC
MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)