12FPC326B0012
Response Deadline
Jun 18, 2026, 5:00 PM(EDT)29 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
Please see Attachment 1 Specificaitons document for further details.
Tyler Dam Rehabilitation Worchester County, MA
Site Showing on:
Wednesday, May 27ᵗʰ at 10:00 AM at the site
200 Robin Hill Street
Marlborough, MA 01752
The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream
of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street
intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Mark Domingo
DEPARTMENT OF AGRICULTURE
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
FPAC BUS CNTR-ACQ DIV
FPAC BUS CNTR-ACQ DIV
FPAC BUS CNTR-ACQ DIV
1400 INDEPENDENCE AVE SW
WASHINGTON, DC, 20250
NAICS
Other Heavy and Civil Engineering Construction
PSC
CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Set-Aside
Total Small Business Set-Aside (FAR 19.5)