Loading...
W911RZ26QA032
Response Deadline
Jul 31, 2026, 4:00 PM(MDT)16 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The contractor shall remove outdated heating and electrical components and install new, fully functional systems
tailored to each shelter’s needs. Work includes replacing the existing 10kW, 34K BTU electric heaters in Shelters 1
and 2; installing new non-explosion-proof light and fan switch kits (two-switch assemblies) in all applicable
shelters; and providing new explosion-proof interior light assemblies in Shelters 2 and 3. All repairs must
ensure the shelters meet operational requirements for the safe storage of petroleum, oil, and lubricants and
restore reliable environmental control across the facility.
Mia White
Farah Surin
DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
W6QM MICC-FT CARSON
W6QM MICC-FT CARSON
BLDG 1220
1676 EVANS STREET
FORT CARSON, CO, 80913-5198
NAICS
Oil and Gas Pipeline and Related Structures Construction
PSC
MAINT/REPAIR/REBUILD OF EQUIPMENT- FUELS, LUBRICANTS, OILS, AND WAXES
Set-Aside
No Set aside used