STATEMENT OF WORK
CGC MUNRO
NR2 SHIP SERVICE DIESEL GENERATOR
EMCP and ECM INSTALL
Background. Munro has had several issues with the Load Sharing and speed control of the #2 SSDG over the last several weeks. With extensive trouble shooting all results have not corrected the issue. When singled up the generator will not hold the load and cause a “brown out” when in parallel with the other generators trips offline under reverse power relay condition. Ships engineers found Electronic Modular Control Panel (EMCP 3.2) and Electronic Control Module (ECM) faulty which are now obsolete. Cat tech is needed to install both modules and reprogram to stabilize generator.
CGC MUNRO
Attn: Engineer Officer
USCG Base Kodiak, 5th St, Kodiak Station, AK 99619
10.1. USCG-SFLC-LRE PL Asset Management: LTJG Igor Guerrero, igor.guerrero@uscg.mil 510-685-0519
DEPARTMENT OF HOMELAND SECURITY
US COAST GUARD
SFLC PROCUREMENT BRANCH 2(00085)
SFLC PROCUREMENT BRANCH 2(00085)
COAST GUARD ISLAND, BLDG 50-7
ALAMEDA, CA, 94501
NAICS
Ship Building and Repairing
PSC
MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)