Loading...
W519TC26QA162
Response Deadline
Jun 29, 2026, 9:00 PM(CDT)Today
Eligibility
Contract Type
Presolicitation
This is a notice that a solicitation is anticipated to be forthcoming and will have all the necessary documents. Please see the attached Scope of Work (SOW) PR #2025-0316 for detailed project requirements.
The scope of this project consists of furnishing labor, equipment, and material to install two 10-inch dual wall preinsulated polyvinyl chloride (PVC) chilled water pipes from building 108 to building 114. The process of installing the new pipe will require the removal and replacement of the existing pavements in Parking Lot 131A, 2nd Street, Parking Lot 144, and South Avenue. The existing pavements are a combination of hot mix asphalt (HMA) and portland cement concrete (PCC). The project is located along South Avenue, starting inside building 114, transitioning outside of the building and tracking along Parking Lot 131A, crossing 2nd Street, traversing along Parking Lot 144, finally crossing South Avenue and ending inside building 108 on the Rock Island Arsenal, Rock Island, IL.
The performance and payment bonds are required and add that this is a 100% small business set aside.
Detric Ross
Kathy Ward
DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
ACC-CTRS
ACC RI
W6QK ACC-RI
W6QK ACC-RI
ACC ROCK ISLAND BLDG 60
3055 RODMAN AVE
ROCK ISLAND, IL, 61299-0000
NAICS
Water and Sewer Line and Related Structures Construction
PSC
REPAIR OR ALTERATION OF HEATING AND COOLING PLANTS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)