19AU9026Q0015
Response Deadline
Aug 6, 2026, 8:00 AM(GMT+2)36 days
Eligibility
Contract Type
Solicitation
The upgrade of the generator control system consists of, but is not limited to the following:
Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion.
Regulations/standards incl. electro- technical safety regulations:
ÖNORM B 2110 General terms for construction work
ETG 1992 electrical engineering law
ÖVE/ÖNORM- E 8101
ÖVE/ÖNORM- E 8015-1-3
ÖVE/EN 1
DIN German industrial standards
VDI guidelines
Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum.
Planned Execution period: Ocotober 2026
Zahid Raja
DEPARTMENT OF STATE
DEPARTMENT OF STATE
US EMBASSY VIENNA
U.S. EMBASSY VIENNA
DEPARTMENT OF STATE, 2201 C ST NW
WASHINGTON, DC, 20520
NAICS
Electric Power Transmission, Control, and Distribution
PSC
ELECTRICAL CONTROL EQUIPMENT