Loading...
FA461026SS1585
Response Deadline
Sep 15, 2026, 8:00 PM(PDT)4 days
Eligibility
Contract Type
Sources Sought
The 30th Contracting Squadron (30 CONS/PKB) at Vandenberg SFB, CA, is conducting market research to identify capable sources for a combined commercial supply and service requirement at Titan Dorm (Building 13135).
Products Required:
88 Twin XL Bunkable Bedframes: Solid hardwood/hardwood veneer construction, durable institutional finish, tool-less/hook assembly, integrated wire spring support, designed to seat 38" x 80" mattresses.
88 Twin XL Innerspring Mattresses: Finished dimensions 38" x 80" x 8"–11", firm, reversible, heavy-duty innerspring coils with continuous border wire butt-welded for perimeter edge support, institutional fluid-proof/bedbug-resistant ticking, fully compliant with 16 CFR Part 1632 and 16 CFR Part 1633.
Services & Facility Constraints:
Inside Delivery & Assembly: Unloading, staging, full assembly, placement, and leveling across 44 rooms (two standalone, unbunked beds per room; rooms measure 8' x 8'). Complete removal and off-base disposal of all packing debris.
De-Installation & Haul-Away: Dismantle, remove, and transport 44 existing Full XL bedframes and mattresses from Building 13135 to the base warehouse facility.
Multi-Story Stairwell Access (No Elevators): Building 13135 has no passenger or freight elevators. All new items must be manually carried up stairwells (clear stairwell width: 36.5 inches), and all removed assets must be manually carried down stairwells.
Critical Schedule Feasibility
Meeting the required project timeline is critical.
Full building access is available 1 October 2026.
Target/desired installation completion date is 16 November 2026.
Mandatory Final Completion Date: All delivery, full assembly, and removal services must be 100% complete NO LATER THAN (NLT) 4 December 2026.
Responders must explicitly state their manufacturing lead time and provide written confirmation of their ability to guarantee on-site delivery and completed installation by 4 December 2026. If unable to meet this date, vendors must provide their absolute earliest guaranteed completion date.
Submission Details & Optional ROM
Interested vendors are requested to submit a brief capability statement addressing:
Schedule Feasibility: Confirmation of guaranteed completion NLT 4 December 2026 and total lead time from award.
Technical Compliance: Brief confirmation that offered products meet the salient characteristics.
Logistics Capability: Confirmation of ability to execute multi-story manual stairwell carries without elevator support.
Contract Vehicles & Socio-Economic Status: Company name, CAGE, SAM Unique Entity Identifier (UEI), business size standard under NAICS 337121/337122, and any active GSA MAS contracts.
Optional Rough Order of Magnitude (ROM): Vendors are encouraged to submit an optional, non-binding ROM breakdown covering:
88 Bedframes
88 Mattresses
Freight to Vandenberg SFB (Zip 93437)
On-site assembly, staging, and leveling labor
De-installation, haul-away, and warehouse delivery labor
Jeffrey Weeks and Grace Chang grace.chang@spaceforce.mil
Chris hummel
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
SPACE SYSTEMS COMMAND
FA4610 30 CONS PK
FA4610 30 CONS PK
BLDG B8500 CP 6061733
1515 ICELAND AVE
VANDENBERG SFB, CA, 93437-5212
NAICS
Upholstered Household Furniture Manufacturing
PSC
HOUSEHOLD FURNITURE
Set-Aside
Total Small Business Set-Aside (FAR 19.5)