Loading...
6973GH-26-Q-00130-ASR-9_Weather_Kits
Response Deadline
Sep 11, 2026, 7:00 PM(CDT)16 days
Eligibility
Contract Type
Solicitation
1. BACKGROUND
The Federal Aviation Administration (FAA) has identified a requirement to procure conversion kits to support modifications to the Air Traffic Control Beacon Interrogator (ATCBI-5) configuration at Airport Surveillance Radar Model 8 (ASR-8) facilities as part of the Brand-New Air Traffic Control System (BNATCS) implementation under the Radar System Replacement (RSR) Program.
The rotary joints currently installed at ASR-8/ATCBI-5 sites do not provide the number of signal paths required to support integration with the RSR architecture. To achieve compatibility, the existing rotary joints must be converted to the configuration utilized at ASR-8 sites equipped with the Mode Select Beacon System (Mode-S). This conversion requires the installation of a kit developed by AJW-1433, which adds an additional signal path to accommodate Weather Signal transmission through the rotary joint.
2. CONTRACTING OFFICER’S REPRESENTATIVE (COR):
The COR formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The COR is:
Brandon Brumley
AJW-L910, Radar Technical and Program Support Branch
3. SCOPE OF WORK
The contractor must furnish all labor, facilities, equipment, and materials to fabricate a kit as outlined in each section that follows.
A. CLIN 001 – One (1) First Article Unit - Shall be delivered NLT 90 days After Receipt of Order
B. CLIN 002 – Option to purchase up to thirty-nine (39) Production Units after first article approval
4. REQUIREMENTS
4.1 Design, Construction, and Testing
The contractor shall procure and package the parts listed in Attachment 1 – Parts List into a Kit.
4.2 First Article Unit Delivery
Contractor must deliver one verification unit. Delivery shall occur no later than (NLT) ninety (90) days at receipt of order (ARO).
4.3 Verification Unit Analysis
Upon receipt of first article unit, FAA shall perform visual inspection to determine conformance to Attachment 1 – Parts List. FAA will have 30 days to accept or reject first articles.
4.4 Production Units
Once approval is provided for the first article unit, the contractor shall be considered an approved source of production units. The number of units for production is thirty-nine (39). Delivery of production units shall occur NLT 180 days after notification of First Article Approval.
5. PREPARATION FOR DELIVERY
5.1 Preservation, Packaging, and Packing
Preservation, packaging, and packing shall be IAW Provision 61.
Raymond Lena
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
6973GH FRANCHISE ACQUISITION SVCS
6973GH FRANCHISE ACQUISITION SVCS
AAQ-700, MULTI-PURPOSE BLDG (MPB)
6500 S MACARTHUR BLVD
OKLAHOMA CITY, OK, 73125
NAICS
Other Electronic Component Manufacturing
PSC
ELECTRONIC MODULES
Set-Aside
Total Small Business Set-Aside (FAR 19.5)