70Z027-26-R-00008
Response Deadline
Sep 17, 2026, 7:00 PM(EDT)3 days
Eligibility
Contract Type
Solicitation
9/11/2026: Question - At the walk thru it was stated that we are replacing the shower stall same as existing. That is a shower base and fiberglass fabricated walls. Patch in tile around shower as required. The scope of work I interpret as installing new base pan and installing subway ceramic tile on the shower walls from floor to ceiling. Please clarify what is to be provided.
Answer: We want the entire shower replaced including pan and wall. We understand some of the tiles will need to be replaced, so we ask to either replace with direct copy of what is already there or recommend an accent border.
Question - So, the walls and base will be fiberglass to match existing and patch ceramic around the stall. The base and walls are a prefabricated unit that comes in 3 or 4 pieces as a kit. Is that correct? Answer - Yes
8/28/2026: Updates have been made to attachment documents for this solicitation to answer questions posed regarding bid bonds, evaluation criteria and other items. Please review ALL documents as the answers are incorporated into the SOW, Construction RFQ Clauses, and the SF-1442. Further questions should be posed via email to SKCS Sergio Cosby, the listed Contracting Officer's Representative.
The contractor shall provide all personnel, equipment, tools, transportation, supervision and
other items and services necessary to replace 15 showers in their entirety. All details are included in the SOW.
DEPARTMENT OF HOMELAND SECURITY
US COAST GUARD
TRACEN CAPE MAY(00042)
TRACEN CAPE MAY(00042)
1 MUNRO AVENUE
CAPE MAY, NJ, 08204
NAICS
Plumbing, Heating, and Air-Conditioning Contractors
PSC
REPAIR OR ALTERATION OF OFFICE BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)