N6660426Q0291
Response Deadline
Jun 12, 2026, 6:00 PM(EDT)10 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
PLEASE READ THIS ENTIRE NOTICE CAREFULLY AS IT CONSTITUES THE ONLY NOTICE THAT WILL BE ISSUED.
Amendment 0001 6/2/2026:
The purpose of this Amendment is to:
RFI 001
1. For the flex duct penetration through the exterior wall, will this require a full, top-to-bottom piece of the metal siding to be replaced, or will a partial repair be acceptable?
A1. Partial repair is approved. The Navy is seeking to eliminate any drafts once the duct work is removed. Penetration in wall shall be completely sealed.
2. Please provide pictures of the windows requiring new glazing. Please include interior and exterior photos and possibly an exterior photo of the entire wall, showing upper and lower windows. For interior, please ensure the hardware is captured.
A2. No new glazing is required.
3. During the site visit, it was observed that a leak capture system was in place. Please confirm if this roof leak has been repaired, or if the leak is still active.
A3. Leak is no longer active. No repairs to roof are required.
4. The solicitation documents included a Hazmat study of the building. Within this study, it indicates that lead paint is found on the white paint on drywall walls, white paint on the wood window sills, and the pale yellow paint on the concrete exterior wall under the drywall. For this project scope and limit of disturbance, there are no white drywall walls, no window sills, and the concrete exterior wall under the drywall will not be exposed. Is lead paint remediation required under the scope of work for only the Rm 136 renovations?
A4. See Revised Specifications (REV 1).
5. There is no spec for the glass for the windows. Will a spec section for the glass be made available?
A5. See Revised Specifications (REV 1).
6. Does the electrical subcontractor performing the electrical scope of work need to hold a Rhode Island electrical license, or will an out-of-state electrical license suffice for this project?
A6. Out-of-State is Allowed.
7. Are electric man-lifts permitted for use on this project?
A7. Yes, however, it might be difficult getting a man lift in the area of work.
All other solicitation terms and conditions remain unchanged.
-------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Please see N6660426Q0291 and all attachments for complete requirement details.
Contractors do not have to be JCP certified to receive the Solicitation, including drawings, specifications, and photos, but they must have an active registration in SAM.GOV.
Interested parties should request access to drawings, specifications, and photos within the attachments section of this solicitation. NUWCDIVNPT will review and approved requests within SAM.GOV.
A controlled attachment requires special handling due to the information it contains. You must have a data entry or administrator role within the Contract Opportunities domain for an entity in SAM.gov in order to request access. If you do not have a proper role, you can request it from an existing entity administrator or have the existing administrator assign roles directly to you. If your entity does not have a direct employee, officer or board member appointed as the Entity Administrator, you will need to complete an Entity Administrator Appointment Letter.
You must request access to the attachment by clicking on its title and providing the reason you need access.
You will not receive immediate access to view the document. The contracting officer will review your request to grant or reject your access.
Your entity is responsible for managing the documents in accordance with prescribed directives.
https://www.fsd.gov/gsafsd_sp?id=gsafsd_kb_articles&sys_id=733b9d881bbc71506397ec21f54bcb0a
Michael Ouellette
DEPT OF DEFENSE
DEPT OF THE NAVY
NAVSEA
NAVSEA WARFARE CENTER
NUWC DIV NEWPORT
NUWC DIV NEWPORT
1176 HOWELL ST
NEWPORT, RI, 02841-1703
NAICS
Commercial and Institutional Building Construction
PSC
MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)