Loading...
FGWB21000AB_1
Response Deadline
Jul 7, 2026, 6:00 PM(EDT)70 days
Eligibility
Contract Type
Presolicitation
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
FA6703 94TH CONTRACTING FLIGHT PK
FA6703 94TH CONTRACTING FLIGHT PK
ADMIN ONLY NO REQTN CP 678 655 5783
1538 ATLANTIC AVE BLDG 812
DOBBINS AFB, GA, 30069-4900
NAICS
Water and Sewer Line and Related Structures Construction
PSC
REPAIR OR ALTERATION OF OTHER UTILITIES