Loading...
FA8628-27-R-B001
Response Deadline
Jul 6, 2026, 9:00 PM(EDT)61 days
Eligibility
Contract Type
Sources Sought
The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.
To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.
The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).
Key Objectives for Industry Feedback:
Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.
Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).
Inform the Government's overall Acquisition Strategy.
Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.
Ashley Gray
Matthew Lesko
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
BOMBER AIRCRAFT
FA8628 AFLCMC WBDK B52
FA8628 AFLCMC WBDK B52
CP 937 713 6290
2690 LOOP ROAD WEST BLDG 556
WRIGHT PATTERSON AFB, OH, 45433-7148
NAICS
Other Aircraft Parts and Auxiliary Equipment Manufacturing
PSC
AIRFRAME STRUCTURAL COMPONENTS
Set-Aside
No Set aside used