SOW for RWTH 01-21-1 Renew USCGC STRATTON (WMSL-752) This solicitation is to renew Raised Watertight Hatch 01-21-1 ON STRATTON The Contractor shall provide all necessary labor, supervision, tools, equipment, materials, safety controls, and services to remove and replace RWTH 01-21-1 on STRATTON. The Government will furnish the replacement 60” x 60” hatch, including the associated coaming. The Contractor shall remove the existing hatch and associated components; prepare, repair, or modify the deck opening and surrounding structure as necessary; install and weld the replacement hatch and coaming; and adjust all latches, locks, sensors, supports, and related hardware to ensure proper fit, operation, and security. The Contractor shall protect adjacent shipboard equipment and spaces; comply with all applicable safety, hot-work, ammunition, welding, inspection, preservation, and environmental requirements; and coordinate work with Coast Guard personnel. The Contractor shall inspect and test the completed installation, including weld examination, alignment, watertightness, and operational testing, and restore affected insulation, sheathing, coatings, labels, nameplates, sensors, and security hardware. The completed hatch must be structurally sound, watertight, properly secured, and fully operational. Contractor is to perform work IAW WORK ITEM 1: RWTH 01-21-1, Renew Vendor to Perform work at ships homeport: CGC STRATTON UNITED STATES COAST GUARD BASE ALAMEDA 1 EAGLE ROAD ALAMEDA, CA 94501 All drawings are available upon request from the technical librarian. Vendor must submit drawing requests to provided POC. Security requirements: No special security requirements needed. POP: 30NOV26 - 11DEC26 POC: APM PE LT Adrian Rubio 657-944-8163 LT Summer Gould 206-827-5310