Loading...
N4008426B8910
Response Deadline
Jun 9, 2026, 5:00 AM(GMT+9)33 days
Eligibility
Contract Type
Solicitation
The contractor shall furnish all labor, supervision, management, tools, martials, equipment, facilities transportation, incidental engineering, and other necessary item to perform demolition, removal, and disposal of building as follows:
Building and Structures
− Interior and exterior finishes, Roofing, Foundation, Structural Components, Tanks, Pipelines
Building Systems
− Heating, Ventilation, and Air Conditioning (HVAC), Fire Protection, Boilers (excluding Central Utility Plant Boilers), Unfired Pressure Vessels (UPV), Compressed Air Systems, Potable Water (including backflow prevention devices), Wastewater, Electrical, Lightning Arrestors and Grounding Devices, Cathodic Protection Systems, Grease Traps, Exhaust Hoods and Ducts, Roll-up Doors, Ventilation Systems
Miscellaneous
− Signs, Drainage Ditches, Shed
Roads and Paved Surfaces
− Sidewalks, Drainage Systems
Chito Bong F. Carabeo
DEPT OF DEFENSE
DEPT OF THE NAVY
NAVFAC
NAVFAC PACIFIC CMD
NAVFAC FAR EAST
NAVFACSYSCOM FAR EAST
NAVFACSYSCOM FAR EAST
PSC 473 BOX 13
FPO, AP, 96349-0013
NAICS
Site Preparation Contractors
PSC
SALVAGE- DEMOLITION OF BUILDINGS