FY265281014
Response Deadline
Jun 19, 2026, 9:00 PM(MDT)15 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
This is a combined synopsis/solicitation for commercial items in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued separately.
The solicitation number is FY265281014 and this solicitation is issued as a request for quote (RFQ).
This is a 100% Small business Set Aside. The associated North American Industry Classification System (NAICS) code is 335313 Switchgear and Switchboard Apparatus Manufacturing with a corresponding small business standard of 1,250 employees.
Only offers from small businesses will be considered for this solicitation.
Offer due date/local time: 3:00 PM Mountain on June 19, 2026. Please reference the solicitation number FY265281014 in the subject line. PDF format is preferred.
Offers shall be emailed to angelica.baca@ibwc.gov. FAXED QUOTES WILL NOT BE ACCEPTED.
Active Unique Entity ID (UEI#) shall be included with your offer.
Price Sheet shall be included with your quote.
Only questions submitted by email to angelica.baca@ibwc.gov will be considered. Questions received from Offerors after 3:00 pm Mountain on June15, 2026, may not be responded to.
Contractors are highly encouraged to attend an agency organized site visit. Site visits may be scheduled with Mr. Juan Escobar at juan.escobar@ibwc.gov or Evelio Siller at Evelio.siller@ibwc.gov. Virtual site visits (video/photographs) are not permitted.
Site visits should be scheduled for NLT June 10, 2026.
Description: The International Boundary and Water Commission is seeking a price quote for Refurbish Breakers as per SOW attached, for the IBWC Amistad Field Office located at 670 Texas Spur 349, Del Rio, TX 78840.
The Contractor shall complete work within 180 calendar days after the contract has been awarded.
The government will award to the lowest price, technically acceptable, responsible offeror. The Contractor shall provide all labor, material, equipment, subcontract, supervision, and management to perform the requirements of this Statement of Work (SOW).
The Government will award a contract resulting from this solicitation to the responsible Offeror based on Lowest Price Technically Acceptable. Technical acceptability will be based on the Contractor’s Technical Approach, Expertise and Qualified Personnel to provide the services, and Past Performance.
Technical Approach - Quote must demonstrate the technical approach by providing a narrative addressing all the items in the scope. The narrative shall at a minimum include your plan of action, equipment, key team members, and schedule.
Past Performance – Quotes shall demonstrate successful past performance of at least 3 three (3) references for similar projects. The information shall include name of person, company, phone number, email address, and brief description of the project.
Offerors shall meet or exceed and specifications and scope of work of items being quoted.
Failure to submit required technical approach, past performance and Price Sheet form will deem a proposal non-responsive and no consideration for award will be given.
Offerors shall include a completed copy of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. NOTE: The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website accessed through http://www.acuisition.gov.
INVOICE PROCESSING PLATFORM
The U.S. Section International Boundary and Water Commission (USIBWC) has transitioned to an electronic invoicing system. The Invoice Processing Platform (IPP) is a secure, web-based system provided by the U.S. Department of the Treasury’s Bureau of the Fiscal Service in partnership with the Federal Reserve Bank of St. Louis. IPP is available at no cost to any commercial vendor or independent contractor doing business with a participating government agency.
Information concerning accessing the IPP system will be provided at time of award.
END of combined synopsis/solicitation.
Attachments:
Performance Work Statement
Price Sheet
Applicable Provisions and Clauses
Wage Determination
5/28/26 Modification 001 - Submit Updated PWS, and 4 OCB attachments.
See Q&As as follows:
Schedule
6/4/26 M002 - Submit attachment with "close-up photographs" and see Q&As below.
1. Concerning the Air Compressor Scope referenced in PWS §1.4 and §2.1.D, please disregard the instruction in PWS §1.4, which lists "replace air compressor" as a refurbishment objective. Likewise, set aside the directive in PWS §2.1.D that instructs the Contractor to purchase and install a new air compressor within the 138 KV OCB Breaker enclosure. Instead, kindly refer to the McGraw-Edison Type AHF-54 manufacturer service literature (Instruction S290-50-1, "Type OA-3 Hydraulic Operating Mechanism"). This documentation specifies that the operating mechanism is hydraulic and utilizes a motor-driven pump alongside a nitrogen-pre-charged accumulator for storing and releasing operating energy.
2. Regarding the Scope of Work—Assessment versus Combined Assessment-and-Execution: Please disregard PWS §2.1.A through §2.1.C, which outline assessment activities such as inspection of current conditions, preparation of a maintenance plan report, and compilation of a parts list (including description, brand, lead time, manufacturer, supplier name, and location). Similarly, disregard PWS §2.1.D, E, G, & M, which pertain to execution activities including the purchase and installation of a new air compressor. Instead, proceed with PWS §2.1.F, H, I, J, K, L, & N, covering execution tasks such as removal and disposal of dielectric oil, procurement and installation of new dielectric oil, purchasing and application of sandblast media, purchasing and application of epoxy paint, and replacement of electrical components, contact boards, pneumatic and hydraulic parts, as well as mechanical parts within the OCB Control Cabinet. Please note that this does not include 138 KV bushing hardware. Regarding PWS §2.1.I, submittals and conditions for parts procurement under these execution activities should be presented for Plant Superintendent approval.
3. The Image Binder posted by the Government on May 29, 2026 includes site photographs of the three OCB tanks and the operating mechanism cabinet. Page 14 of the Binder shows the control cabinet interior with the Gould Pump motor and the Parker Hannifin nitrogen-precharged accumulator visible, but the pump and motor nameplate detail is not legible in the available image. AEEI requires the pump and motor model number, horsepower rating, voltage, RPM, and serial number to source replacement service parts (seals, bearings, drive coupling, pressure-relief assemblies) and to determine whether the Gould motor and the pump are catalog or OEM-rebuild items. Could the Government provide a close-up photograph of the OA-3 operating mechanism pump and motor nameplate (and any associated tags on the pump body or pressure-relief block)? If the nameplate is illegible or missing, a written transcription of any visible model, serial, and rating information would be acceptable.
Attached close-up photographs of the OA-3 Hydraulic Pump/Motor nameplate as requested.
4. PWS §2.1.M references replacement of control wiring runs; PWS §3.4 identifies approximately 30% non-friable asbestos content in the legacy fabric-sheath control wiring requiring AHERA-credentialed handling and abatement. The Image Binder does not provide a measured cable-run distance between the OCB local control panel at the dam apron and the main control room equipment to which the control circuits land. Could the Government provide the approximate one-way cable-run distance (in linear feet) between the OCB local control panel and the main control room termination equipment? An estimate to the nearest 25 feet is sufficient. This information is required to size the control wiring takeoff for pricing, to estimate asbestos abatement scope per PWS §3.4, and to assess whether the legacy raceways can be reused.
The cable-run distance from the OCB Control Panel to the Main Control Room Equipment is, according to the prints, 730 feet.
Angelica Baca
Seone Michael Jones
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNAT BOUNDARY AND WATER COMM
INTERNAT. BOUNDARY AND WATER COMM.
4191 N. Mesa
El Paso, TX, 79902
NAICS
Switchgear and Switchboard Apparatus Manufacturing
PSC
CIRCUIT BREAKERS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)