Loading...
PANMCC-26-P-047957
Response Deadline
Jul 9, 2026, 3:00 PM(CDT)10 days
Eligibility
Contract Type
Solicitation
Xact Metal 200G Metal 3D Printer System (With Installation and OEM OnSite Training) Complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEMled operator training, and operational verification. System shall be configured and supplied with:
Laser Configuration: Single (1) 400-Watt Laser Build Height: Extended Build Height (11.5") Reactive Enabled: Supports safe processing of aluminum and other reactive metals Glove Box: Integrated powderhandling glove box. Sieving Station: OEM powder sieving station for material reclamation. Safety Equipment: Specialized metal powder vacuum for safe cleaning and mitigation of inhalation/combustion hazards.
Installation Services: Onsite unboxing, physical setup, utility connection, and system calibration /verification by certified OEM technicians at Fort Hood, TX. OEM-Led Training (Bundled): 2-3 days of intensive, onsite, hands-on operational and safety training at Fort Hood, TX. Training shall be scheduled and conducted only after the printer has been fully installed, calibrated, and verified as operational. Training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.
All questions must be submitted in writing to the POCs listed below no later than 11:59 pm (CST), 6 July 2026.
marvin.e.hopkins4.mil@army.mil
donelle.h.white.mil@army.mil
jasper.l.cruz.mil@army.mil
Marvin Hopkins
CSS, 418th CSB
DEPT OF DEFENSE
DEPT OF THE ARMY
AMC
ACC
MISSION INSTALLATION CONTRACTING COMMAND
418TH CSB
0418 AQ HQ CONTRACTING SUP
0418 AQ HQ CONTRACTING SUP
BDE CONTRACT SUPPORT SECTION CSS
36000 SHOEMAKER LANE
FORT HOOD, TX, 76544
NAICS
All Other Industrial Machinery Manufacturing
PSC
MISCELLANEOUS SPECIAL INDUSTRY MACHINERY
Set-Aside
Total Small Business Set-Aside (FAR 19.5)