Loading...
N4008526R9076
Response Deadline
Aug 31, 2026, 7:00 PM(EDT)33 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The work includes removal and replacement of damaged sidewalk portions located off Powder Lane on Stone Bay, Camp Lejeune NC as well as repair to any damaged grass and/or road that occurred during construction of this project. This scope of work is to be accomplished at MTI Reflector Towers 01, 05, 19 & 23 on the flightline aboard, New River, North Carolina. The work includes pouring (4) new 4" concrete slabs measuring 20'x22'-6" each over crushed rock at existing MTI reflector locations. (3) of the sites will include minimal site work to ensure level slab, (1) site includes building of retaining wall and dirt infill to create level slab. Each concrete slab will have (2) 2” Sch 40 PVC conduits built into slab and ran below grade 5’ beyond slab edge for future use.
DEPT OF DEFENSE
DEPT OF THE NAVY
NAVFAC
NAVFAC ATLANTIC CMD
NAVFAC MID-ATLANTIC
NAVFACSYSCOM MID-ATLANTIC
NAVFACSYSCOM MID-ATLANTIC
9324 VIRGINIA AVENUE
NORFOLK, VA, 23511-0395
NAICS
Highway, Street, and Bridge Construction
PSC
REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)