Loading...
26-009
Response Deadline
Jul 24, 2026, 10:00 PM(HST)2 days
Eligibility
Contract Type
Sources Sought
Requirement is to remove two fuel pit door lids, referred to here as stall A and B. The fuel pit door from stall B is to be then installed into stall A. Service must include all necessary labor and materials. Contractor must ensure safe and proper operation of fuel pit door once installed from stall B to stall A. Fuel pit doors weigh approximately 660lbs and measure approximately 30 inches wide by 78 inches long. Part is DABICO DAB-725WP.
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5215 766 ESS PKP
FA5215 766 ESS PKP
ADMIN ONLY NO REQTN CP 808 789 3117
560 CENTRAL AVE BLDG 287
JBPHH, HI, 96860-4928
NAICS
Commercial and Institutional Building Construction
PSC
REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Set-Aside
No Set aside used