Loading...
191BWC26R0006
Response Deadline
Sep 9, 2026, 9:00 PM(MDT)35 days
Eligibility
Contract Type
Solicitation
The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a Solicitation for the complete the Design-Build of Retamal Dam Buoy System. Upon conclusion of the project, the new waterway barrier line will prevent public access to dangerous hydraulics upstream/downstream of the dam, the warning system and signage will alert the public of the danger ahead providing a waterway barrier line to include anchors, alert system, and warning signs at the Retamal Dam.
The Construction includes, but is not limited to, site preparation, inspection of all systems and structures, disposal of debris and construction waste, quality control testing.
The working hours of the USIBWC facility are 7:00 am to 3:30 pm, Monday through Friday. The Contractor and any subcontractors shall only work on site during these proposed hours. USIBWC facilities, including the dam, are closed during all federal Holidays.
Workers must pass though USIBWC levees to access Retamal Dam. Boarder Patrol are present in the area. Contractor and subcontractor shall have identifying vehicular when working in the area. US Fish and Wildlife own land adjacent to Retamal Dam. Contractor shall stay clear of US Fish and Wildlife property.
A site visit date is listed in the Solicitation. A completed Form 358 is also required prior to attendance at the prebid site visit.
This requirement will be solicited under FAR Part 36 and FAR Part 15. All responsible sources must submit a bid to be considered by the Agency.
Adrian Knights
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
INTERNAT BOUNDARY AND WATER COMM
INTERNAT. BOUNDARY AND WATER COMM.
4191 N. Mesa
El Paso, TX, 79902
NAICS
Other Heavy and Civil Engineering Construction
PSC
BUOYS
Set-Aside
No Set aside used