Loading...
36C26226Q1150
Response Deadline
Aug 21, 2026, 9:30 PM(PDT)7 days
Eligibility
Contract Type
Combined Synopsis/Solicitation
The purpose of this amendment 0002 is to extend the response due date, add previously excluded buildings, and provide the Questions and Answers.
PLEASE NOTE THAT BUILDINGS ERRONEOUSLY EXCLUDED IN THE ORIGINAL SOLICITATION ARE NOW INCLUDED - Buildings 2, 20, 29, 30, 31, 32 and S45 parking garage
Submission of your final response shall be received electronically not later than 2:30 PST on 08/21/2026 at Stephanie.Naron@va.gov. Subject line should include “RESPONSE TO RFQ 36C26226Q1150.”
QUESTIONS AND ANSWERS
Both
The drone shall be used on the Stucco. The windows shall be cleaned by hand; the main building has a catwalk available for use for window cleaning.
Yes.
The Statement of Work describes exterior building cleaning (drone-based soft-wash, hard-surface pressure washing, interior/exterior glass cleaning) with no structural construction or modification component. Would you please clarify:
(a) Is the reference to "General Building license (Class B)" a drafting error, and did the VA intend to specify the C-61/D-38 Sand and Water Blasting specialty classification, or another CSLB classification?
The reference to General Building license (Class B) is an error. The VA intended to specify C-61/D-38 Sand and Water Blasting specialty classification.
(b) Does the VA consider this requirement satisfied through subcontracting arrangements with a CSLB-licensed teaming partner (consistent with the 50% prime performance requirement under VAAR 852.219-75), or must the prime contractor hold the license directly?
The prime contractor must hold the C‑61/D‑38 license directly if the contract includes pressure washing and exceeds $500. A subcontracting arrangement with a licensed firm does not satisfy this requirement—holding the license remains with the entity contracting directly with the VA.
Under California Business and Professions Code §§ 7026, 7028, and 7048, any person or entity that offers to contract for, bids on, or performs construction‑related services—including exterior cleaning and pressure washing—must hold the appropriate CSLB license when the total value of labor and materials meets or exceeds $500. The statutory definition of “contractor” (§ 7026) applies to entities performing work “by or through others,” meaning licensing responsibility cannot be delegated to a subcontractor. Contracting without the required license is a misdemeanor under § 7028, and the $500 threshold is established in § 7048.
(c) Will the VA accept an out-of-state incorporated small business meeting all federal certifications (Part 107 UAS, OSHA 30-hour, active SAM registration, Section 889 / ADSA compliance, dedicated $2M UAS aviation liability insurance) with a compliance plan to satisfy any California-specific licensing requirement within the pre-performance period?
All licensing requirements must be fulfilled before starting performance.
The procurement will remain a standard total small‑business set‑aside and the Veterans First provisions (VAAR 819.7004, VAAR 852.219‑75) will be removed, allowing the subcontracting requirements to be governed by the applicable government‑wide SBA rules (FAR 52.219‑14 and 13 CFR 125.6) rather than VA‑specific veteran‑preference regulations.
The reference to General Building license (Class B) is an error. The VA intended to specify C-61/D-38 Sand and Water Blasting specialty classification.
The reference to General Building license (Class B) is an error. The VA intended to specify C-61/D-38 Sand and Water Blasting specialty classification.
The reference to General Building license (Class B) is an error. The VA intended to specify C-61/D-38 Sand and Water Blasting specialty classification.
Yes, one complete cleaning cycle each contract year.
Buildings 2, 20, 29, 30, 31, 32 and S45 parking garage
Additional information will be provided at a later date once available.
Approximately 400 EXTERIOR windows. Interior glass cleaning WILL NOT be included in this requirement.
Buildings 2, 20, 29, 30, 31, 32 and S45 parking garage
Contractors shall provide their own water source except in the courtyard. The courtyard has spigots available for use.
Locations will be established with the VA during performance planning.
This sentence was included as an error and is not part of the requirement.
DEPARTMENT OF VETERANS AFFAIRS
DEPARTMENT OF VETERANS AFFAIRS
262-NETWORK CONTRACT OFFICE 22 (36C262)
262-NETWORK CONTRACT OFFICE 22 (36C262)
335 E. German Rd
SUITE 301
Gilbert, AZ, 85297
NAICS
Other Support Activities for Air Transportation
PSC
HOUSEKEEPING- CUSTODIAL JANITORIAL
Set-Aside
Total Small Business Set-Aside (FAR 19.5)