CONTACT INFORMATION|4|N722.28|B4H|771-229-0553|ABRIANNA.SALEH.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE ADN RECEIVING REPORTS COMBO||TBD|N00383|TBD|TBD|SEE SCHEDULE|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|1 YEAR|45 DAYS OF DISCOVER OF DEFECT|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4|||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
ROYALTY INFORMATION (APR 1984)|1||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|
All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders and modifications) related to the instant procurement areconsidered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or
sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to "issue" contractual documents asdetailed herein.
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular
business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.
Required RTAT: (xx) days after reciept of asset
Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initialdelivery commencesX/month (contractor fill in #). A throughput of
1. SCOPE
1.1 Articles to be furnished hereunder shall be repaired, tested andinspected in accordance with the terms and conditions specified in theRequirements Section of this document.
1.2 Unless expressly provided for elsewhere in this clause, equipment suchas fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, orany other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.3 The use of MIL-W-81381 wire in any item to be delivered under this procurement is prohibited. The foregoing prohibition applies notwithstanding any reference to MIL-W-81381 wire that may be made in any of the drawings or specifications for this
procurement. SAE-AS22759 series wire shall be used in lieu of MIL-W-81381 wire, in any place where MIL-W-81381 wire is cited in this procurement. Any questions concerning this requirement should be directed to the Procuring Contracting Officer.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification,the contractor is expected to show compliance with IPC/EIAJ-STD-001C Personnel performing tasks in accordance with IPC/EIAJ-STD-001C shall be trained and certified as requried by
IPC/EIAJ-STD-001C paragraph 5.1.4.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
FRCSW will delegate the First Article Inspection to the DCMA for processes
check
FRCSW will review all of the FAT paperwork upon receipt from the completed DCMA witnessed inspection.
The repair awardee will need to send FRCSW a copy of the paperwork and pictures of the part before and after identified critical processes/steps.
FRCSW will create a list of processes after which they will require a report with pictures to be sent to FRCSW before final FAT approval.
Note, FRCSW would look for a FAT part(s) that would have all of the critical processes. It could be more than 1 part for the inspection.
4. QUALITY ASSURANCE
The overhaul facility address for RUAG is:
RUAG Australia Pty Ltd,
836 Mountain Highway
Bayswater, Victoria, 3153, Australia
Compliance to the following publications:
APPLICABLE PART NUMBERS:
NSN:1630-01-265-3659 Part Number: 2606071-5 (Nose Landing Gear)
NSN:1630-01-265-3660 Part Number: 2609545-2 (Main Landing Gear)
REPAIR MANUAL/PROCEDURES/TECHNICAL DATA:Overhaul IAW with the following Government Furnished Information (GFI) Technical Data:
F/A-18A-D Intermediate and Depot level maintenance with illustrated parts breakdown tired Main Landing Gear Wheel
A1-421AA-130-000/Release 15 Feb 2014
F/A-18A-D Intermediate and Depot level maintenance with illustrated parts
breakbreak down tired Main Landing Gear Wheel
A1-421AA-130-000/Release 15 Feb 2014
F/A-18A-D Intermediate and Depot level maintenance with illustrated parts
breakdown tired Nose Landing Gear Wheel
A1-421AA-130-100/Change 1/Release 1 Aug 2017
ANALYSIS PROCEDURES AND REFERENCES:
Requests for repair deviation will be submitted to the FST for review IAW the following
GFI and Paragraph 3.3.5: Request for Deviation. NAVAIR PUBLICATION:
NAVAIR NI Structures Standard Operating Procedure,
SOP F18 AG-002-11, Rev A with amendments 1 and 2.
METHODOLOGY REFERENCES
MACAIR- Report Number 339, Structures Handbook, dated 1 June 1973
MACAIR-Report 338, Structural Analysis Bulletins, dated 1 June 1973
MDC-8500 DEPOT Fatigue Information Report, dated 14 July 1986
F/A-18 Hornet Fatigue Analysis Procedure Manual (FAPM),
REV D,dated 21 February 2014.
FRCSW will delegate the First Article Inspection to the DCMA for processes
check
FRCSW will review all of the FAT paperwork upon receipt from the completed DCMA witnessed inspection.
The repair awardee will need to send FRCSW a copy of the paperwork and pictures of the part before and after identified critical processes/steps.
FRCSW will create a list of processes after which they will require a report with pictures to be sent to FRCSW before final FAT approval.
Note, FRCSW would look for a FAT part(s) that would have all of the critical processes. It could be more than 1 part for the inspection.
5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES - NOT APPLICABLE