Loading...
697DCK-26-R-00425
Response Deadline
Sep 21, 2026, 11:00 PM(PDT)17 days
Eligibility
Contract Type
Solicitation
Scope:
It is the purpose of this specification that the elevators identified in the contract documents must be properly maintained such that at the end of the contract period they will be substantially in the same condition with respect to performance, cleanliness, safety, wear, and appearance as at the beginning of the contract period.
Maintenance Requirements:
The Contractor must make regular and systematic monthly examinations and adjustments to maintain the efficiency, safety, speed, and operating characteristics as originally designed and installed by the manufacturers of the equipment, including acceleration, deceleration, contract speed with or without full load, floor to floor time, door opening and closing time, and leveling accuracy. The Contractor must make minor repairs to or replace the small operating parts of the elevator system at no additional cost to the FAA. Small parts must be considered as those having a cost of Seven hundred dollars ($700.00) or less in the quantity normally used to repair or replace a specific component, e.g. one coil for a relay; a set of contacts and carbon brushes. Replacement of major parts, e.g. the controllers, motors, traction machine components, bearings, brake coils, gears, rewinding of motors, renewal of worm and ring gear combinations, and motor generators must be provided to FAA at the lowest price available. For any such parts, which are customarily supplied by the Contractor, such price to FAA under this contract must not exceed the Contractor’s current list price less Government discount. The labor and installation of major parts must be accomplished under the provisions of this contract at no additional cost to FAA. Emergency services must be provided under terms of this contract at no additional costs to FAA. Refer to the section titled Hours of Service below for additional requirements. Repairs and adjustments must be accomplished at no additional cost. Should it be determined during the servicing of the equipment that replacement of major parts is required, such must be reported to the Contracting Officer for approval prior to proceeding with the contemplated work.
At the Government’s discretion, additional facilities may be added to the contract. Please refer to the attached Scopes of Work (SOW) and Appendix/Appendices in Section J of the solicitation for full details.
Note: The Contracting Officer's physical location is iat the FAA's Regional Office in Des Moines, WA 98198.
John Space
Angela Furukawa
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
697DCK REGIONAL ACQUISITIONS SVCS
697DCK REGIONAL ACQUISITIONS SVCS
AAQ-500, FAA SW REGIONAL OFFICE
10101 HILLWOOD PKWY
FORT WORTH, TX, 76177
NAICS
Elevator and Moving Stairway Manufacturing
PSC
MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT
Set-Aside
Total Small Business Set-Aside (FAR 19.5)