HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)|1|ISO 9001|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
PRODUCTION LOT TESTING|1||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1||
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10|||||||||||
FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7||||||||
WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2|||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
SMALL BUSINESS PROGRAM REPRESENTATIONS (DEV 2026-O0037)(FEB 2026)|20|332919|750 |||||||||||||||||||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|X|X|X|||X||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
EVALUATION OF FIRST ARTICLE TESTING|3||||
1. All contractual documents (i.e. contracts, purchase orders, task orders,
Delivery orders, and modifications) related to the instant procurement are
considered to be "issued" by the government when copies are either deposited
in the mail, transmitted by facsimile, or sent by other electronic commerce
methods, such as email. The government's acceptance of the contractor's
proposal constitutes bilateral agreement to "issue" contractual documents as
detailed herein.
2. Drawings or technical data are not available for this item.
3. Delivery days_________aro.
4. Offer valid for _____ days.
5. When submitting quotes via Electronic Data Interchange (EDI), make sure
you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection
& Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of
the exceptions. If nothing is indicated or received, award will be based
upon solicitation requirements. Changes or requests for changes after
award will have consideration costs deducted on modifications.
6. If you are not the manufacturer of the material you are offering, you MUST
state who the Original Equipment Manufacturer (OEM) is �Commercial and
Government Entity Code (CAGE) code� and the part number you are offering.
7. Please provide an email address for follow up communications.
____________________________________________________________
8. It is recommended that vendors provide contact information to NAVSUP Weapon
System Support (WSS) Mechanicsburg in order to receive automated notifications
from Navy Electronic Commerce Online (NECO) when contracts/modifications
are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg
and posted on Procurement Integrated Enterprise Environment (PIEE)
Electronic Data Access (EDA). To receive these notifications, contact:
NAVSUPWSS code 025, procurement systems design and contract support division
Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following
information with your request: CAGE code, company name, address and
Point-of-Contact (POC) with phone number and email address.
9. Contractors can view their orders, contracts and modifications at the
EDA web tool. This web tool is located at the PIEE website. It is
recommended that the contractor register for EDA at https://piee.eb.mil/.
Click on new user and registration.
Any order resulting from this Request for Quotation will require electronic
submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF.
10. The following DLA Procurement Notes are applicable to this requirement:
E06 Inspection and Acceptance at Source (JUN 2018)
11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS):
______________________________________________________________
INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE &
ADDRESS):
______________________________________________________________
12. UCF SECTION F PRODUCTION FACILITY CHANGES
(a) The performance of any of the work contracted for in any place other than
that named in the contract is prohibited unless specifically approved by the
Contracting Officer. Written requests for a change in production facilities
must be submitted in writing to the Contracting Officer. Changes in productionfacilities may be approved, provided:
(1) Performance by small business or in labor surplus areas as required by
the contract will not be changed;
(2) The change will not cause a delay in delivery or necessitate a change in
the purchase description;
(3) The free on board (f.o.b.) point is not changed; and
(4) Each request is supported by a price reduction of $250.00 to cover the
Government's administrative costs to process the change.
(b) The Government reserves the right to deny approval even if these four
elements are met.
This procurement requires Higher Level Inspection.
Award evaluations will be made using the Lowest Price
Technically Acceptable (LPTA) criteria per clause WSSTERMMZ04 -
Evaluation for Award (Lowest Priced Technically Acceptable).
If there are any conflicts with PLT or FAT, the Navy procedures supersede, as
the Navy owns the process.
\
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the VALVE,REGULATING,FL .
2. APPLICABLE DOCUMENTS
2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.1.1 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
2.1.2 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.2 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order,
however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
2.3 ;Requests for additional government-owned documents should be submitted in writing to the contract officer responsible for the applicable order. Release of drawings or other documents will be approved and handled by the technical community for the
system.;
DOCUMENT REF DATA=MIL-STD-130 | | |N |121116|A| | |
DOCUMENT REF DATA=ISO9001 | | | |010417|A| | |
3. REQUIREMENTS
3.1 Design, Manufacture, and Performance - Except as modified herein,
the VALVE,REGULATING,FL furnished under this contract/purchase order shall meet the
design, manufacture, and performance requirements specified on drawing ;5497337, part number 5497337-69;
cage ;53711; .
3.2 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.
3.3 First Article Approval (Government Testing) - First Article Test (FAT) and approval is required.
3.4 Production Lot Approval (Contractor Testing) - Production Lot Test and approval is required.
3.5 Marking - This item shall be physically identified in accordance with MIL-STD-130.
3.6 Configuration Control - MIL-STD-973 entitled "Configuration Management", Paragraph 5.4.8, Configuration Control (Short Form Procedure), is hereby incorporated. The Contractor shall submit all Engineering Change Proposals in accordance with MIL-STD-973,
Paragraph 5.4.8.2 and Appendix D. Requests for Deviations shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.3 and Appendix E. Requests for Waivers shall be processed in accordance with MIL-STD-973, Paragraph 5.4.8.4 and Appendix E. (Original
and two copies shall be submitted to Contracting Officer, NAVICP-MECH, P. O. Box 2020, Mechanicsburg Pa. 17055-0788.)
3.6.1 Configuration Control - When the Contractor has received authorization on a prior contract for the same NSN for the use of a drawing of a later revision status, that authorization is hereby extended to all succeeding contracts/purchase orders until
another drawing revision is approved. The Contractor will notify the PCO of this occurrence in each instance, in the response to the solicitation. Such notification shall be in writing setting forth the contract under which the prior authorization was granted,
the date of the granting of the authorization, and the name of the granting authority.
Contractors shall also refer technical inquiries (other than those covered by MIL-STD-973) on company letterhead signed by a responsible company official, with copies distributed as stated below.
The original and two copies of all Contractor generated correspondence regarding configuration shall be submitted to Contracting Officer, NAVICP-MECH, P.O. Box 2020, Mechanicsburg, PA 17055-0788.
Contractors are cautioned that implementing engineering changes, waivers, deviations or technical inquiries into the contract/purchase order without approval of the Contracting Officer will be at the sole risk of the Contractor.
3.7 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material
will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The
contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting
Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of
contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are
located so as not to constitute a contamination hazard.
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a
polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the
requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a
component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface
ship atmosphere.
3.8 Soldering - The requirements for soldered electrical and electronic assemblies shall conform to IPC J-STD-001, Class ;3; .
4. QUALITY ASSURANCE
4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order,
the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the
specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.2 First Article Test/Inspection (Contractor) - The Contractor shall conduct ;non-destructive; First Article Test/Inspection on ;one; unit(s) in accordance with requirements ;for acceptance of material on drawings; .
4.3 First Article Compatibility Test (Government) - Upon satisfactory completion of the First Article Test/Inspection by the Contractor, ;one; unit(s) shall be shipped to ;NSWC-PHD, MK41 VLS group; for compatibility test to assure satisfactory, form, fit and
function within the applicable end item or system.
Government First Article Compatibility Test shall consist of ;non-destructive; testing. If the testing is nondestructive, the first article sample ;will; be returned.//
4.4 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers
certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.
4.5 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during
the performance of the contract and for a period of four years after final delivery of supplies.
4.6 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any
inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance
does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.7 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies.
4.8 ;First Article Test/inspection report- the contractor shall prepare and submit a report in accordance with the Contract data Requirements List (DD Form 1423) The report shall be approved prior to production.;
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
6. NOTES
6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS)
(i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/
A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center
Code 8410P, 101 Strauss Avenue
Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for
certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVSUP-WSS
Code 87321
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue:
Commanding Officer
NAVSUP-WSS
Code 009
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Commanding Officer
NAVSUP-WSS
Code 1 Support Branch
700 Robbins Avenue
Philadelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS.
6.2 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of
this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.
6.3 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information
contained on those documents and drawings.
There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows:
A... approved for public release; distribution is unlimited.
B... distribution authorized to US Governments agencies only.
C... distribution authorized to US Government agencies and their contractors.
D... distribution authorized to DoD and DoD contractors only.
E... distribution authorized to DoD Components only.
F... further distribution only as directed by Commander, Naval Sea
Systems Command, code 09T.
X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical
data in accordance with OPNAVINST 5510.161.
Manufacturing sources interested in becoming qualified for support of future requirements for this item should submit their interest in writing to the Contract Officer, to include a summary of the company's applicable capabilities. This will be forwarded to the
appropriate point of contact at NSWC, PHD for evaluation.
DATE OF FIRST SUBMISSION=ASREQ
Block 12 - Submit for approval prior to production.
Block 14A - The deliverable item specified as information copy shall be boldly marked as "Information Only".
Block 14 - Port Hueneme Division, Naval Surface Warfare Center, ;MK 41 VLS Engineering Activity ; ,Port Hueneme, CA 93043-5007.
DATE OF FIRST SUBMISSION=045 DAC
Block 12 - Submit for approval prior to production.
Block 14A - The deliverable item specified as information copy shall be boldly marked as "Information Only".
Block 14 - Port Hueneme Division, Naval Surface Warfare Center, ;MK 41 VLS Engineering Activity ; ,Port Hueneme, CA 93043-5007.
DATE OF FIRST SUBMISSION=ASREQ
100% INSPECTION IS REQUIRED
DATE OF FIRST SUBMISSION=ASREQ
;GOVERNMENT COMPATIBILITY TESTING TO BE COMPLETED 45 DAYS FROM RECEIPT OF FAT UNIT / TEST REPORT FROM CONTRACTOR. ;
DATE OF FIRST SUBMISSION=ASREQ
Request for Waiver- Prior submission
Based on past successful delivery of material on contracts