Loading...
W9127826RA046
Response Deadline
Jul 7, 2026, 7:00 PM(CDT)11 days
Eligibility
Contract Type
Solicitation
Phase 1 Breakwater. This contract involves constructing the initial phase for the restoration of Deer Island, specifically restoring the extension of the rock breakwater structure known as Katrina Key, approximately 12,000 feet, to soften the effects of normal wave erosion. This restoration includes placement of armor layer stone or bioengineered reef as the breakwater and associated geocomposite placement to return Katrina Key to near historical 1850’s dimensions.
Offerors are hereby advised that all references to the FAR and DFARS within this solicitation pertain to the new Revolutionary FAR Overhaul (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide). While much of the verbiage has remained consistent with the previous version of the FAR and DFARS, there are notable differences. It is incumbent upon the contractor to be fully aware of these changes and ensure their proposal complies accordingly.
5/28/2026: AM0001 posted to PIEE
6/26/2026: AM0002 posted to PIEE
Paul Adamo
DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH ATLANTIC
ENDIST MOBILE
W074 ENDIST MOBILE
W074 ENDIST MOBILE
KO CONTRACTING DIVISION
100 CANAL STREET
MOBILE, AL, 36602-3630
NAICS
Other Heavy and Civil Engineering Construction
PSC
CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Set-Aside
Total Small Business Set-Aside (FAR 19.5)