Loading...
F3YCEB6058A101
Response Deadline
Jul 1, 2026, 8:00 PM(CDT)7 days
Eligibility
Contract Type
Presolicitation
** THIS IS A PRE-SOLICITATION NOTICE. NO QUOTES WILL BE ACCEPTED UNTIL THE REQUEST FOR QUOTE (RFQ) IS POSTED. **
The 76th CMXG is requesting the purchase of one (1) BRAND NAME Altitude Test Chamber Blower Replacement. The requested equipment item description/specifications are outlined below:
a. Item one – Altitude Test Chamber System Pressurization Blower.
(1) Model Number: Dearing Compressor and Pump Co. Pressure Blower System Part Number DSP-2505-8CM-6-50 or equal.
(2) Quantity: One (1) each
(3) The replacement unit shall be a direct replacement for the current Pressure Blower System Model 38406A, Serial Number 27335 used in conjunction with the existing Altitude Chamber Test System and shall meet all form, fit, and functions of the original unit.
(4) The new direct replacement Pressure Blower System shall meet all the design requirements of the original Pressure Blower system.
(5) The new replacement blower shall be a centrifugal multistage blower.
(6) The blower operational design criteria shall be inlet air pressure range from 28 inches HgA to 31 HgA, inlet air temperature range from 0 degrees F to 115 degrees F, inlet air design temperature of 80 degrees F, output air volume of 2000 SCFM, and outlet air pressure of 6 psig at 2000 SCFM.
(7) The blower section joints shall be equipped with O-Rings.
(8) The blower shall utilize labyrinth seals.
(9) The new replacement blower shall be equipped with a 100 HP TEFC premium efficient motor with 460 VAC, 3 phase and 60 Hz power requirements, and an operational speed of 3600 rpm.
(10) The motor shall be equipped with a conduit box for connection to the existing facility starter power enclosure.
(11) The new replacement blower and motor shall be skid mounted as a packaged unit.
(12) The skid shall be constructed of I-Beam steel and powder coated.
(13) The blower motor package shall be equipped with all required motor and blower shaft coupling components and rotational safety guards for a complete operational system.
(14) The new direct replacement Pressure Blower system shall connect to the existing Altitude Chamber Test System.
(15) Any substitutions shall be responsible for connection to the existing Altitude Chamber Test System and functional testing to ensure form, fit, and function of the Altitude Chamber Test System is maintained.
A Firm Fixed Price type contract is contemplated.
Estimated Period of Performance: 18-20 weeks ARO
This is a small business set-aside.
System for Award Management (SAM) is required to receive any award. Contractors can register electronically at https://www.sam.gov/portal/public/SAM/. The NAICS code for this requirement is 333912 with a size standard of 1,000 EMP.
Foreign Participation: No
For further information contact:
Jordan Rausch
Contract Specialist
Jordan Rausch
Tran Tran, PCO
DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8125 AFSC PZIMA
FA8125 AFSC PZIMA
CP 405 734 9107
3001 STAFF DR STE 2S76
TINKER AFB, OK, 73145-3303
NAICS
Air and Gas Compressor Manufacturing
PSC
COMPRESSORS AND VACUUM PUMPS
Set-Aside
Total Small Business Set-Aside (FAR 19.5)